My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS ' <br /> 1 <br /> Trench Excavation and Backfill Decision Tree <br /> For Work within the Community Protection Measures Boundary <br /> Material Excavated <br /> From Trench <br /> No Yes <br /> Zone A Material Zone B Material <br /> Structurally Below top 2 feet? <br /> Suitable for ' <br /> Backfill? <br /> No • ' <br /> Excess Material? <br /> Yes v Structurally <br /> No Yes ® Suitable for <br /> Backfill? <br /> V Yes No <br /> Backfill <br /> Trench <br /> v V <br /> Dispose Dispose <br /> Legend <br /> ♦ Decision <br /> Water Main Improvement"U" Division 2—EARTHWORK October 1, 2019 <br /> WO No.—UP3698 SP—144 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.