My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 4 - BASES <br /> 4-04 BALLAST AND CRUSHED SURFACING <br /> 4-04.1 Description <br /> Delete the second paragraph of 4-04.1 and substitute the following: <br /> Work shall also consist of placing crushed surfacing stone as driveway maintenance <br /> material and in gravel driveway restoration as shown on the Plans or directed by the <br /> ' Engineer. The quantity shown in the Proposal is an estimate for the purpose of <br /> establishing a unit price only. Actual quantities will be measured as construction <br /> progresses. The Engineer may require that some or all of the crushed surfacing be <br /> removed because of contamination or to meet final grades. Removal shall be included <br /> ' with work for "Crushed Surfacing Top Course" or"Crushed Surfacing Base Course." <br /> 4-04.3 Construction Requirements <br /> Supplement 4-04.3 by adding the following: <br /> 4-04.3(12) Gravel Driveway Restoration <br /> (******) <br /> ' Replace existing gravel driveways removed in order to allow construction of the new <br /> improvements as follows: <br /> Restore gravel driveways by placing a minimum of 3-inches of"Crushed Surfacing Base <br /> Course" on subgrade compacted to 95 percent standard density in accordance with 2- <br /> 03.3(14)D. <br /> Preparation and compaction of the subgrade shall be included in "Crushed Surfacing <br /> ' Base Course" with no direct compensation made. <br /> 4-04.3(13) Gravel Driveway Maintenance <br /> (******) <br /> Maintain existing driveway access by providing and placing Crushed Surfacing Base <br /> Course as necessary and directed by Engineer to allow continued access until <br /> completion of final gravel drive restoration. <br /> 1 4-04.4 Measurement <br /> Delete the first paragraph of 2-02.4 and substitute the following: <br /> ' Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 4-04.5 Payment <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> ' as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 4-06 ASPHALT TREATED BASE <br /> ' Supplement 4-06.3 by adding the following: <br /> 4-06.3(0) General <br /> ' Do NOT construct the asphalt treated base course until all underground utilities are <br /> completed and inspected and approved by the Engineer. <br /> Asphalt treated base may be placed for providing temporary access to adjoining <br /> properties where directed by the Engineer. <br /> Watermain Replacement"U" Division 4-BASES October 1, 2019 <br /> WO No.—UP3698 SP-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.