Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> This lump sum bid item includes the maintenance and protection of traffic control materials, <br /> tools, and equipment necessary to accomplish the Work in accordance with 1-10.3(2) <br /> TRAFFIC CONTROL PROCEDURES, including and not limited to, signs, barricades, cones, <br /> flashers, reader boards, and temporary pavement markings.Also included is cost associated <br /> with preparation and distribution of public notices involving parking, street access or traffic <br /> 1 issues. <br /> Bid Item 7 - Trench Excavation Safety Systems <br /> Measurement and Payment: Lump Sum (LS) <br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and <br /> backfilled to the total quantity of pipe listed on the Proposal. <br /> 1 The lump sum bid item includes the costs directly allocated to the safety system for trenches <br /> and all other excavations including, but not limited to, shoring, benching, bracing, excavation, <br /> sheeting, and trench box. This Work shall be accomplished in accordance with Divisions 1, <br /> 2, 7, and 8 of the Standard Specifications and these Special Provisions. Payment per lump <br /> sum includes all equipment, materials, labor, installation, and removal, and all other work <br /> required to meet the trench excavation and safety system requirements. <br /> Bid Item 8 - Street Cleaning and Sweeping <br /> Measurement and Payment: Unit Price per Hour (HR) <br /> The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all <br /> labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning, <br /> and dust control water required for this project. <br /> Measurement for street sweeping and cleaning will be by the hour for the actual time <br /> consumed in pavement sweeping, cleaning and debris removal. No allowance will be made <br /> for time consumed in making repairs to the equipment or for moving the equipment to or from <br /> the site on which the street cleaning is ordered. No separate payment will be made for water <br /> required for dust control and the normal operation of the pickup sweepers. <br /> Bid Item 9 - Erosion/Water Pollution Control <br /> Measurement and Payment: Force Account (FA) <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br /> ACCOUNT; except, as modified below. <br /> Erosion/Water Pollution Control, Force Account, shall constitute full compensation for all <br /> labor, materials, tools and equipment necessary and incidental for the installation, <br /> maintenance and removal of the temporary erosion and sedimentation control (TESC) <br /> facilities to prevent pollution, erosion, siltation, and damage to any wetland, stream, other <br /> watercourse, or surrounding property throughout the life of the Contract. TESC facilities shall <br /> include, but not be limited to, any cover measures, runoff control measures, soil and site <br /> stabilization measures, silt fencing as shown on the Plans, and inlet protection measures for <br /> the work area and downstream areas. <br /> The TESC measures shall limit the erosion possibility by covering disturbed soils, preventing <br /> sloughing or raveling of cut and natural slopes, and controlling surface runoff from flowing <br /> into excavations using measures such as curbs, berms, dikes, rock-lined ditches, and other <br /> approved measures. Filter fabric fence shall be used to treat small areas of non-concentrated <br /> runoff prior to discharge from the site. <br /> Bid Item 10 - Foundation Material, Class A or B <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Watermain Replacement"U" Division B—BID DESCRIPTIONS October 1, 2019 <br /> WO No.—UP3698 SP-5 <br />