Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> c. Should u closure of the intersection in its entirety be <br /> necessary keep such closure to the minimum time <br /> required to place and compact the HMA mixture, plane, <br /> remove asphalt, tack coat, and as needed. <br /> d. Any work in an intersection requires advance warning in <br /> both signage and a number of Working Days advance <br /> notice as determined by the Engineer, to alert traffic and <br /> emergency services of the intersection closure or partial <br /> closure. <br /> e. Allow new compacted HMA asphalt to cool to ambient <br /> temperature before allowing any traffic on it. Traffic is not <br /> allowed on newly placed asphalt until obtaining Engineer <br /> approval. <br /> 2. Comply with Section 8-23 for temporary centerline marking, <br /> post-paving temporary marking, temporary stop bars, and <br /> maintaining temporary pavement marking. <br /> 3. Comply with Section 8-22 for permanent pavement marking. <br /> 5-04.3(14)B2 Submittals— Planing Plan and HMA Paving Plan <br /> ' Submit a separate planing plan and a separate paving plan to the <br /> Engineer at least five Working Days in advance of each operation's <br /> activity start date. These plans must show the coordination of moving <br /> operation and traffic control as they will be discussed at the pre- <br /> planing briefing and pre-paving briefing. When requested by the <br /> Engineer, provide each operation's traffic control plan on 24 x 36 inch <br /> or larger size Drawings at a scale of 1 inch equals 20 feet showing <br /> both the area of operation and sufficient detail of traffic beyond the <br /> area of operation that may require detouring traffic. The scale on the <br /> Shop Drawings may be changed if the Engineer agrees sufficient <br /> detail is shown. <br /> The planing operation and the paving operation include, but are not <br /> limited to, metal detection, removal of asphalt and temporary asphalt <br /> of any kind, tack coat and drying, staging of supply trucks, paving <br /> trains, rolling, scheduling, and as may be discussed at the briefing. <br /> When intersections will be partially or totally blocked, provide <br /> adequately sized and noticeable signage alerting traffic of closures to <br /> come a minimum two Working Days in advance. Show on the traffic <br /> control plan the stationing of peace officers when signalization is or <br /> may be countermanded'Also show areas flaggers positioning. <br /> Include, at a minimum, on the planing and paving plan: <br /> 1. A copy of the accepted traffic control plan, refer to Section 1- <br /> 10.2(2), detailing each day's traffic control as it relates to the <br /> specific requirements of that day's planing and paving. Briefly <br /> describe the traffic control sequencing consistent with the <br /> proposed planing and paving sequence, and scheduling of <br /> placement of temporary pavement markings and channelizing <br /> 1 devices after each day's planing, and paving. <br /> 2. A copy of each intersection's traffic control plan. <br /> 3. Haul routes from Supplier facilities and locations of temporary <br /> parking and staging areas, including return routes. Describe <br /> Watermain Replacement"U" Division 5—SURFACE TREATMENTS October 1, 2019 <br /> AND PAVEMENTS <br /> WO No.—UP3698 SP-165 <br />