My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS I <br /> the complete round trip as it relates to the sequencing of <br /> paving operations. <br /> 4. Names and locations of HMA Supplier facilities to be used. <br /> 5. List of all equipment to be used for paving. <br /> 6. List of personnel and associated job classification assigned to <br /> each piece of paving equipment. <br /> 7. Description (geometric or narrative) of the planing and paving <br /> sequence schedule and intended area of planing and of <br /> paving for each day's work, the directions of proposed planing <br /> and paving, sequence of adjacent lane paving, sequence of <br /> skipped lane paving, intersection planing and paving <br /> scheduling and sequencing, and making of proposed timely <br /> notifications and coordination. Also show HMA joints relative <br /> to the final pavement marking lane lines. <br /> 8. Names, job titles, and contact information for field, office, and <br /> plant supervisory personnel. 1 <br /> 9. A copy of the approved Mix Designs. <br /> 10. Tonnage of HMA to be placed each day. <br /> 11. Approximate times and days for starting and ending daily <br /> operations. <br /> 5-04.3(14)B3 Pre-Paving and Pre-Planing Briefing <br /> At least two Working Days before the first paving operation and the <br /> first planing operation, or as scheduled by the Engineer for future <br /> paving and planing operations to ensure the Contractor has <br /> adequately prepared for notifying and coordinating as required in the <br /> Contract, the Contractor must be prepared to discuss that day's <br /> operations as they relate to other entities and to public safety and <br /> convenience, including driveway and business access, garbage truck <br /> operations, transit operations and working around energized <br /> overhead wires, school and nursing home and hospital and other <br /> accesses, other contractors who may be operating in the area, <br /> pedestrian and bicycle traffic, and emergency services. The <br /> Contractor, and Subcontractors that may be part of that day's <br /> operations must meet with the Engineer and discuss the proposed <br /> operation as it relates to the submitted planing plan and paving plan, I <br /> approved traffic control plan, and public convenience and safety. <br /> Such discussion includes, but is not limited to: <br /> 1. General for both Paving Plan and for Planing Plan: I <br /> a. The actual times of starting and ending daily operations. <br /> b. In intersections, how to break up the intersection, and <br /> address traffic control and signalization for that operation, <br /> including use of peace officers. <br /> c. The sequencing and scheduling of paving operations and <br /> of planing operations, as applicable, as it relates to traffic <br /> control, to public convenience and safety, and to other <br /> con-tractors who may operate in the Project Site. <br /> d. Notifications required of Contractor activities, and <br /> coordinating with other entities and the public as <br /> necessary. <br /> I <br /> Watermain Replacement"U" Division 5—SURFACE TREATMENTS October 1, 2019 <br /> AND PAVEMENTS <br /> WO No.—UP3698 SP- 166 <br />
The URL can be used to link to this page
Your browser does not support the video tag.