Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> e. Description of the sequencing of installation and types <br /> of <br /> temporary pavement markings as it relates to planning <br /> and to paving. <br /> f. Description of the sequencing of installation of, and the <br /> removal of, temporary pavement patch material around <br /> exposed castings and as may be needed <br /> g. Description of procedures and equipment to identify <br /> hidden metal in the pavement, such as survey <br /> monumentation, monitoring wells, street car rail, and <br /> castings, before planning, refer to Section 5-04.3(14)B2. <br /> h. Description of how flaggers will be coordinated with the <br /> planing, paving, and related operations. <br /> i. Description of sequencing of traffic controls for the <br /> process of rigid pavement base repairs. <br /> j. Other items the Engineer deems necessary to address. <br /> 5. Paving — additional topics: <br /> a. When to start applying tack and coordinating with paving. <br /> b. Types of equipment and numbers of each type equipment <br /> to be used. If more pieces of equipment than personnel <br /> are proposed, describe the sequencing of the personnel <br /> operating the types of equipment. Discuss the <br /> continuance of operator personnel for each type <br /> equipment as it relates to meeting Specification <br /> requirements. <br /> c. Number of JMFs to be placed, and if more than one JMF <br /> how the Contractor will ensure different JMFs are <br /> distinguished, how pavers and MTVs are distinguished if <br /> more than one JMF is being placed at the time, and how <br /> pavers and MTVs are cleaned so that one JMF does not <br /> adversely influence the other JMF. <br /> d. Description of contingency plans for that day's operations <br /> such as equipment breakdown, rain out, and Supplier <br /> shutdown of operations. <br /> e. Number of sublots to be placed, sequencing of density <br /> ' testing, and other sampling and testing. <br /> 5-04.3(15) Sealing Pavement Surfaces <br /> Apply a fog seal where shown in the plans. Construct the fog seal in <br /> 111 accordance with Section 5-02.3. Apply the fog seal prior to opening to traffic <br /> unless Engineer approves otherwise. <br /> 5-04.3(16) HMA Road Approaches <br /> Construct HMA approaches at the locations shown in the Plans or where staked <br /> by the Engineer. Perform the Work in accordance with Section 5-04. <br /> 5-04.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B— Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> 1 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I <br /> Watermain Replacement"U" Division 5—SURFACE TREATMENTS October 1, 2019 <br /> AND PAVEMENTS <br /> WO No.—UP3698 SP-167 <br />