CITY OF EVERETT SPECIAL PROVISIONS <br /> of excavated materials; furnishing, jointing, and installing valves and valve boxes with <br /> extensions if necessary; installing temporary concrete thrust blocks; restraint systems; <br /> painting; flushing and disinfecting; furnishing, installing, compacting, and testing bedding and <br /> backfill materials; constructing asphalt concrete pad around valve box if necessary; cleanup; <br /> and any additional work, materials, and equipment required to install the valves and <br /> assembly, except as included in other unit price bids. <br /> Bid Item 20 - Fire Hydrant <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit price per each shall be full compensation for all work to furnish and install fire hydrant <br /> in accordance with Parts A, B, C, E, F, G, H, I, and J noted in COE Standard Drawing No. <br /> 507. Work includes, and not limited to, all costs for clearing and grubbing; excavation, <br /> removal, haul and disposal of excavated materials; furnishing, installing, testing, and <br /> disinfecting new fire hydrant; shoring; dewatering; furnishing, installing and compacting <br /> bedding and backfill materials; and plastic film wrap required for the complete installation of <br /> the hydrant as specified. I <br /> Bid Item 21 - Salvage Existing Fire Hydrant <br /> Measurement and Payment: Unit Price per Each (EA) <br /> 111 <br /> The unit contract price for Salvage Existing Fire Hydrant shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary for salvaging the existing hydrant, and <br /> delivering it to the City Storage Yard on Railroad Avenue and for removing auxiliary gate <br /> 111 <br /> valve box after COE Water Department personnel closes gate valve, and cutting, capping <br /> existing hydrant lead pipe, providing and compacting backfill in-place.. <br /> Bid Item 22 - Relocate Existing Fire Hydrant I <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Relocate Existing Fire Hydrant shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary for carefully salvaging the existing <br /> hydrant and installing it in new location noted in the Plans and for removing auxiliary gate <br /> valve box after COE Water Department personnel closes gate valve, and cutting, capping <br /> existing hydrant lead pipe, providing and compacting backfill in-place. <br /> Bid Item 23 - Remove Existing Fire Hydrant <br /> Measurement and Payment: Unit Price per Each (EA) I <br /> The unit contract price for Remove Existing Fire Hydrant shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary for removing and disposing of the <br /> existing hydrant and for removing auxiliary gate valve box after COE Water Department I <br /> personnel closes gate valve, and cutting, capping existing hydrant lead pipe, providing and <br /> compacting backfill in-place. <br /> Bid Item 24 - Air Vacuum Valve Assembly, 1-Inch I <br /> Bid Item 25 - Air Vacuum Valve Assembly, 2-Inch <br /> Measurement and Payment: Unit Price per Each (EA) I <br /> The unit contract price for Air Vacuum Valve Assembly, =Inch shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary for providing assembly <br /> in accordance with COE Std Drawing No. 512 or as modified and supplemented herein, in <br /> the location shown on the Plans, including but not limited to, all gaskets, bolts, pipe, nipples, <br /> adapters, couplings, fittings, restraint systems, vertical bends, all other necessary <br /> appurtenances, temporary thrust blocking, trench excavation, sheeting and shoring and <br /> Watermain Replacement"U" Division B—BID DESCRIPTIONS October 1, 2019 <br /> WO No.—UP3698 SP-8 i <br />