My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS <br /> ' Abandon in-place existing service connections noted on the Plans by exposing and <br /> closing the corporation stop at the main and plugging the service line near the public <br /> right of way or easement. <br /> 7-15.3(1) Relocate Water Meter, Setter and Meter Box <br /> (******) <br /> Where shown on the Plans, or as directed by the City Inspector, salvage the existing <br /> water meter, meter box and the meter setter being relocated. City Inspector will check <br /> salvaged materials for damage caused by salvage operations. If damage is not <br /> repairable, then provide new materials at no additional cost. Reinstall salvaged water <br /> 1 meter, meter box and setter and provide new service connection pipe in accordance with <br /> Type A, B, or C Water Service Connection as the case may be and adjust meter box to <br /> finish grade. Restore area where existing meter box was removed. <br /> 1 Abandon in-place existing service pipe connection by exposing and closing the <br /> corporation stop at the main and plugging the service line at the old meter box location. <br /> ' 7-15.4 Measurement <br /> Delete first paragraph of 7-15.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15.5 Payment <br /> ' Delete all paragraphs of 7-15.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I <br /> I <br /> I <br /> Watermain Replacement"U" Division 7—STORM, SEWER,WATER October 1, 2019 <br /> WO No.—UP3698 SP—186 <br />
The URL can be used to link to this page
Your browser does not support the video tag.