My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS <br /> surface of the concrete, in a perpendicular plane to the surface and with the bottom <br /> edge embedded in the subgrade. Install joints in a straight alignment, except where <br /> placed in curved locations as required by the Plans. <br /> 8-14.3(4) Curing <br /> Maintain sufficient protective covering on—site, such as waterproof paper or plastic <br /> ' membrane, to cover an entire day's pour in event of rain or other unsuitable weather. <br /> Protect the concrete sidewalk against damage or defacement until Owner has been <br /> accepted the Work. Remove and replace sidewalk that is not acceptable to the Engineer <br /> because of damage or defacement at Contractor's expense. <br /> After finishing, spray cement concrete sidewalk using transparent curing compound in <br /> accordance with 5-05.3(13)A of the Standard Specifications. <br /> ' 8-14.4 Measurement <br /> Delete all paragraphs in 8-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> ' described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-14.5 Payment <br /> Delete all paragraphs in 8-14.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-22 PAVEMENT MARKING <br /> 8-22.1 Description <br /> Supplement 8-22.1 by adding the following: <br /> Provide 24-inch wide stop line. <br /> Provide 24-inch wide solid white lines for crosswalks in accordance with COE Standard <br /> Drawing No. 721. <br /> ' 8-22.4 Measurement <br /> Delete all paragraphs in 8-22.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-2Z5 Payment <br /> Delete all paragraphs in 8-22.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> t <br /> 1 <br /> ' Watermain Replacement"U" <br /> WO No.—UP3698 Division 8—MISC CONSTRUCTION <br /> SP—199 October 1, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.