My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS I <br /> 1/2" >90 <br /> I <br /> No. 10 >70 <br /> Provide Topsoil Type A free from materials toxic to plant growth, visible seeds, rhizomes, <br /> roots, any Snohomish County listed noxious weeds or invasive root propagating plants, <br /> I <br /> including and not limited to, horsetail, ivy, clematis, and knotweed. Contractor shall <br /> remove and replace soil found to contain these prohibited plant materials. <br /> 9-14.1(3) General Turf Area Soil I <br /> Provide General Turf Area Soil for general use and passive recreation lawn areas where <br /> year-round maintenance and positive drainage are important. <br /> Provide soil consisting of 60 percent sand complying with the particle distribution table I <br /> in this Section, and 40 percent compost by volume. The resulting mix must contain <br /> approximately 4 to 6 percent organic matter by weight tested by the loss on ignitions <br /> method and the following: I <br /> Nutrient Test Unit Range <br /> Phosphorous Bray mg/kg >20 I <br /> Potassium NH4OAc mg/kg >175 <br /> Boron DTPA mg/kg >0.5 <br /> Zinc DTPA mg/kg >5 I Manganese DTPA mg/kg >20 <br /> Iron DTPA mg/kg >20 <br /> Calcium NH4OAc mg/kg >6 <br /> Magnesium NH4OAc mg/kg >2 <br /> Sodium NH4OAc mg/kg <2 <br /> Cation Exchange CEC meq/100g >6 I <br /> pH 6.5 — 7.5 <br /> Nitrogen lbs/ac >200 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Watermain Improvement"U" Division 9—MATERIALS October 1, 2019 I <br /> WO No. -UP3698 SP—204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.