My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I LOG OF EXPLORATORY BORING B-1 <br /> KRAZAN AND ASSOCIATES, INC. PROJECT:Everett Water Main U DATE:09/18/18 <br /> PROJECT NO.:092-18011 PAGE:1 of 1 <br /> 1111 LOGGED BY: JL SURFACE ELEVATION:-- <br /> CONTRACTOR:Geologic Drill BORING TYPE:HSA,Trailer Rig <br /> SAMPLE METHOD:SPT,Split Spoon LOCATION:Everett,WA <br /> Icn <br /> j m -1^ N-VALUE(GRAPH) NaturaMoisturet <br /> w <br /> MATERIAL DESCRIPTION OU^, o: <br /> N rj <br /> ui <br /> a o F- p . Q ° (Percent) <br /> w m a -J m >N a 10 20 30 40 10 20 30 40 <br /> Approx.4-inches of asphalt roadway pavement. <br /> II <br /> 45 Gray-Brown Silty Clay(CH-MH) <br /> (Medium Stiff, Moist) <br /> 0 <br /> 3 <br /> I 05 <br /> 111 -05 <br /> 5 i <br /> X z 5 <br /> / � 3 <br /> /X <br /> �X <br /> 5— <br /> �Xr`y�� <br /> Soil becomes stiff. <br /> /--I 5 <br /> 13 <br /> X B <br /> I0//X5X <br /> 4X <br /> Soil becomes very stiff. 5 <br /> e 19 <br /> 05 <br /> II <br /> I <br /> End of Exploratory Boring <br /> 1 10— <br /> Water Level Initial: Final:1 <br /> IWater Observations:Groundwater seepage was not observed. <br /> Notes:-- <br /> Watermann Replacement"t74' APPENuIX A-SOIL BORINGS October 1,2015 <br /> WO No. UP3698 SP-217 <br />
The URL can be used to link to this page
Your browser does not support the video tag.