My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> LOG OF EXPLORATORY BORING B-2 <br /> i <br /> KRAZAN AND ASSOCIATES, INC. PROJECT: Everett Water Main U DATE:09/18/18 <br /> PROJECT NO.:092-18011 PAGE:1 of 1 <br /> LOGGED BY: JL SURFACE ELEVATION:-- <br /> CONTRACTOR:Geologic Drill BORING TYPE: HSA,Trailer Rig <br /> SAMPLE METHOD:SPT,Split Spoon LOCATION:Everett,WA <br /> I- H Natural Moisture <br /> > Z J N-VALUE(GRAPH) Content <br /> _ N <br /> MATERIAL DESCRIPTION v <br /> I- c0) w 3`O < a M <br /> s (Percent) <br /> wo ? < -i a isi Q 10 20 30 40 10 20 30 40 <br /> m a z m i1. _ i. i <br /> Approx.4-inches of asphalt roadway pavement. <br /> ::" Brown Silty Sand with Gravel (SM)(Dense, Moist) <br /> 49 <br /> - !I i7! <br /> €i. <br /> 0 <br /> a <br /> :i it <br /> i .:• 8 <br /> i§ <br /> 15 <br /> • 35 <br /> .:• 20 <br /> I\ <br /> i it <br /> • <br /> i• <br /> 5-- ::i' 14 <br /> Soil turns brown-gray. <br /> :iic9 41 <br /> - dig 24 <br /> 0 <br /> - lid <br /> :i 101 <br /> 710 Soil turns gray and becomes very dense. 27 <br /> i. <br /> • 32 <br /> ;i vi 50+ <br /> .:• <br /> :i i7 34 <br /> • <br /> VP <br /> End of Exploratory Boring <br /> 10— 1 <br /> Water Level Initial:2 Final:I <br /> Water Observations:Groundwater seepage was not observed. <br /> Notes:-- <br /> 1nTatermam Replacement 'U' Oidi'1 ib October 1, 2018 I <br /> WO No.UP3698 SP-218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.