My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Standard Drawings or as otherwise approved by the Engineer. Crushed Surfacing Top <br /> Course material placed exceeding "neatline" quantities without advance authorization by the <br /> Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br /> equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br /> surfacing top course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing top course also includes all costs for controlling moisture <br /> content. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly <br /> spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing top course will be by the ton of material placed and approved <br /> by the Inspector. <br /> Bid Item 44 - Cement Concrete Pavement <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for Cement Concrete Pavement, including integral curb, shall be per square <br /> yard as delineated by the Contractor and approved by the Inspector prior to removal. <br /> The unit price per square yard for Cement Concrete Pavement shall be full compensation for <br /> all materials, tools, labor and equipment necessary to complete the Work in accordance with <br /> the Plans, COE Standard Drawings, Section 5 of the Standard Specifications and 5-06.3 and <br /> 1 5-06.3 of these Special Provisions. <br /> Bid Item 45 - Cement Concrete Pavement Base (H.E.S.) for Trench Patch <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for Cement Concrete Pavement, (H.E.S.) shall be per square yard as <br /> delineated by the Contractor and approved by the Inspector prior to removal. <br /> The unit price per square yard for Cement Concrete Pavement Base (H.E.S), shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the Work <br /> in accordance with the Plans, COE Standard Drawings, Section 5 of the Standard <br /> ' Specifications and 5-06.3 and 5-06.3 of these Special Provisions. <br /> Bid Item 46 - HMA, CL 1/2" PG 64-22 for Permanent Trench Patch <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for HMA, CL 1/2" PG 64-22 shall be by the ton, recorded on certified weight <br /> tickets in accordance with 1-09.2 WEIGHING EQUIPMENT for HMA placed within the limits <br /> I of dimensions defined in the Work or shown on the Plans, Standard Specifications, Section <br /> 5-06 of these Special Provisions, or as otherwise approved by the Engineer. The <br /> measurement and payment limits for measuring the width of this bid item shall not exceed <br /> the saw-cut limits shown on the Drawings. No deduction will be made for the weight of <br /> asphalt binder, blending sand, mineral filler, or other component of the mixture. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, roll and perform density tests on multiple lifts <br /> Watermain Replacement"U" Division B—BID DESCRIPTIONS October 1, 2019 <br /> WO No.—UP3698 SP-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.