Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> foot for the final saw-cutting of concrete pavement, up to 6-inch thickness includes, but is not <br /> limited to, the saw-cutting necessary for the final joint between existing concrete pavement <br /> and permanent concrete pavement repair. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 40 - Saw-Cutting Concrete Pavement at Construction Joint, Final Joint Cut, I <br /> Up To 6-Inch Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete pavement at construction <br /> joint, up to 6-inch thickness, shall be full compensation for all labor, material, tools, and <br /> equipment necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of <br /> the Standard Specifications, these Special Provisions and as shown on the Plans. The unit <br /> price per lineal foot for the final saw-cutting of concrete pavement, up to 6-inch thickness <br /> includes, but is not limited to, the saw-cutting necessary for the final joint between existing <br /> concrete pavement and permanent concrete pavement repair. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 41 - Saw-Cutting Concrete Curb & Gutter & Sidewalk <br /> Measurement and Payment: Unit Price per Linear Foot (LF) 1 <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete curb and gutter and sidewalk, <br /> shall be full compensation for all labor, material, tools, and equipment necessary to <br /> satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> Specifications, these Special Provisions and as shown on the Plans. The unit price per lineal <br /> foot for the final saw-cutting of concrete curb and gutter and sidewalk includes, but is not <br /> limited to, the saw-cutting necessary for the final joint between existing concrete sidewalk or <br /> curb and permanent concrete repair. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 42 - Temporary Pavement Patch <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for Temporary Pavement Patch shall be by the square yard placed within the <br /> sawcut neatlines limits of dimensions defined in the Work, descriptions for other bid items, , <br /> shown on the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit price per square yard for Temporary Pavement Patch in accordance with Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans shall be full <br /> compensation for all work necessary to complete Temporary Pavement Patch in accordance <br /> with these specifications. <br /> Regardless of duration or sequence of work, this item will be measured and paid one time. 1 <br /> Bid Item 43 - Crushed Surfacing Top Course <br /> Measurement and Payment: Unit Price per Ton (TON) I <br /> Measurement for crushed surfacing top course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, details or COE , <br /> Watermain Replacement"U" Division B—BID DESCRIPTIONS October 1, 2019 <br /> WO No.—UP3698 SP-12 <br /> 111 <br />