Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Table of Contents <br /> Table of Contents i <br /> ADVERTISEMENT FOR BIDS 1 <br /> 1 DIVISION B - BID ITEM DESCRIPTIONS 3 <br /> DIVISION P - PROPOSAL 17 <br /> BID SCHEDULE 19 <br /> IPROPOSAL SIGNATURE SHEET 23 <br /> SUBCONTRACTORS FORM 24 <br /> I DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 25 <br /> NON-COLLUSION AFFIDAVIT 26 <br /> BID DEPOSIT 27 <br /> IBID BOND 27 <br /> DIVISION C - CONTRACT 31 <br /> II PAYMENT BOND 35 <br /> PERFORMANCE BOND 37 <br /> DIVISION 1 - GENERAL REQUIREMENTS 39 <br /> I ****** <br /> General Description and Location of Project ( ) 39 <br /> Design Engineer (******) 39 <br /> I Standard Specifications (******) 39 <br /> 1-01 DEFINITIONS AND TERMS 40 <br /> 1-01.3 Definitions 40 <br /> I 1-02 BID PROCEDURES AND CONDITIONS 45 <br /> 1-02.1 Prequalifications of Bidders 45 <br /> 1-02.1 Bidder Responsibility Criteria (******) 45 <br /> I1-02.2 Plans and Specifications 45 <br /> 1-02.4 Examination of Plans, Specifications, and Site of Work 46 <br /> 1-02.5 Proposal Form 47 <br /> I1-02.6 Preparation of Proposal 47 <br /> 1-02.7 Bid Deposit 48 <br /> I 1-02.8 Noncollusion Declaration and Lobbying Certification 48 <br /> 1-02.9 Delivery of Proposal 48 <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal 49 <br /> I 1-02.12 Public Opening of Proposals 49 <br /> 1-02.13 Irregular Proposals 49 <br /> 1-02.14 Disqualification of Bidders 50 <br /> I 1-02.15 Pre-Award Information 50 <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 51 <br /> 1-03.1 Consideration of Bids 51 <br /> IWatermain Replacement"U" Table of Contents - October 1, 2019 <br /> WO No.-UP3698 SP-i <br /> I <br />