My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-03.2 Award of Contract 51 I <br /> 1-03.3 Execution of Contract 52 <br /> 1-03.4 Contract Bond 52 <br /> 1-03.5 Failure to Execute Contract 52 <br /> 1-03.6 Return of Bid Deposit 52 <br /> 1-03.7 Judicial Review 53 <br /> 1-04 SCOPE OF THE WORK 53 <br /> 1-04.1 Intent of the Contract 53 <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda 54 <br /> 1-04.3 Reference Information 54 <br /> 1-04.4 Changes 55 <br /> 1-04.4 Changes 55 <br /> 1-04.5 Procedure and Protest by the Contractor 56 <br /> 1-04.5 Notice by Contractor (******) 56 <br /> 1-04.6 Variation in Estimated Quantities 58 <br /> 1-04.7 Differing Site Conditions (Changed Conditions) 58 <br /> 1-05 CONTROL OF WORK 59 <br /> 1-05.1 Authority of the Engineer 59 <br /> 1-05.1 City (******) 59 <br /> 1-05.2 Authority of Assistants and Inspectors 59 <br /> 1-05.2 City's Representative (******) 59 <br /> 1-05.3 Working Drawings 60 <br /> I <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes 62 <br /> 1-05.6 Inspection of Work and Materials 64 <br /> 1-05.7 Removal of Defective and Unauthorized Work 65 <br /> 1-05.10 Guarantees 66 <br /> 1-05.11 Final Inspection 66 <br /> 1-05.11 Final Inspections and Operational Testing (******) 66 <br /> 1-05.12 Final Acceptance 68 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 68 <br /> 1-05.14 Cooperation With Other Contractors 68 <br /> 1-05.16 Water and Power (******) 69 <br /> 1-05.17 Oral Agreements (******) 69 <br /> 1-05.18 Contractor (******) 70 <br /> 1-05.19 City-Contractor Coordination (******) 72 <br /> 1-06 CONTROL OF MATERIAL 73 <br /> 1-06.1 Approval of Materials Prior to Use 73 <br /> 1-06.2 Acceptance of Materials 74 <br /> 1-06.3 Manufacturer's Certificate of Compliance 74 <br /> 1-06.4 Handling and Storing Materials 75 <br /> 1-06.6 Recycled Materials 75 <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 75 <br /> 1-07.1 Laws to be Observed 75 <br /> 1-07.2 State Taxes 77 IIWatermain Replacement"U" Table of Contents - October 1, 2019 <br /> WO No.- UP3698 SP -ii <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.