My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together <br /> with a request to furnish a Contract Bond and evidence of insurance and to execute the <br /> Contract set forth in the Contract Documents. <br /> 1-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> Successful Bidder has 14 calendar days after receiving the Notice of Award to submit <br /> the following documents to the City: <br /> • Two executed copies of the Contract. I <br /> • Two original payment bonds and two original performance bonds submitted on <br /> forms contained in Contract Documents. <br /> • Certificate of Insurance and additional insured endorsement in accordance with <br /> 1-07.18 "Insurance" of the Special Provisions. <br /> Revise the third paragraph of 1-03.3 to read as follows: <br /> If the Bidder experiences circumstances beyond their control that prevents return of the <br /> Contract Documents within 14-calendar days after the Award Date, the City may grant <br /> more time for return of the documents, provided the City deems the circumstances <br /> warrant it. 111 <br /> Supplement 1-03.3 by adding the following: <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1-03.4 Contract Bond <br /> Revise 1-03.4 to read as follows: <br /> The Contractor shall provide a separate payment bond and performance bond, each in <br /> the amount of 100 percent of the Contract Sum and each in the form contained in the <br /> Contract Documents. These bonds shall serve as security for the faithful performance <br /> of the Work and as security for the faithful payment and satisfaction of the persons <br /> furnishing materials and performing labor on the Work. The bonds shall be issued by a <br /> corporation duly and legally licensed to transact surety business in the State of <br /> Washington. Such bonds shall remain in force throughout the period required to <br /> complete the Work, and thereafter for a period of 365 calendar days after Final <br /> Acceptance. The bonds must be executed by a duly licensed surety company, which is <br /> listed in the latest Circular 570 of the United States Treasury Department, as being <br /> acceptable as surety on federal bonds. No suretys liability on the bond shall exceed <br /> the underwriting limitations for the respective surety specified in Circular 570. The bonds <br /> must be signed by an officer of the Contractor empowered to sign binding instruments. <br /> The bonds must be accompanied by a fully executed and original power of attorney for <br /> the officer executing on behalf of the surety. The scope of the bonds or the form thereof <br /> prescribed in these Contract Documents shall in no way affect or alter the liabilities of <br /> the Contractor to the Owner as set forth in the Contract Documents. 1 <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit <br /> Supplement 1-03.6 by adding the following: I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—52 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.