My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contract Sum or Contract Time shall be allowed unless the Contractor has followed the <br /> procedures provided for in this Contract, including, but not limited to, furnishing timely <br /> ' Notice of the event and its effect on Contract Time and Contract Sum as required herein. <br /> 1-05 CONTROL OF WORK <br /> 1-05.1 Authority of the Engineer <br /> Delete 1-05.1 and substitute the following: <br /> 1-05.1 City <br /> The City, and the City's Representative, shall have the authority to act as the sole judge of <br /> the Work and materials with respect to both quantity and quality as set forth in the Contract. <br /> It is expressly stipulated that the Plans, Specifications and other Contract Documents set <br /> forth the requirements as to the nature of the completed Work and do not purport to control <br /> the method of performing Work except in those instances where the nature of the completed <br /> Work is dependent on the method of performance. <br /> The City has the authority to act, do, perform, and make all decisions and actions authorized <br /> by the Contract Documents, including, but not limited to, Change Orders, progress payments, <br /> contract decisions, acceptability of the Contractors Work, and early possession. The City <br /> has the authority to accept or reject requests for progress payments that have been submitted <br /> by the Contractor and recommended by the City's Representative. The City has the authority <br /> to make determinations of the acceptability of the Work. The City also has the authority to <br /> accept or reject the City's Representatives recommendatio ns regarding retention of defective <br /> Work. <br /> 1-05.2 Authority of Assistants and Inspectors <br /> Delete 1-05.2 and substitute the following: <br /> 1-05.2 City's Representative <br /> The City's Representative shall be satisfied that all the Work is being done in accordance <br /> with the requirements of the Contract. The Contract and Specifications give the City's <br /> Representative authority over the Work. Whenever it is so provided in this Contract, the <br /> decision of the City's Representative shall be final. <br /> The City's Representative's decisions will be final on all questions including, but not limited <br /> to, the following: <br /> 1. Quality and acceptability of materials and Work; <br /> 2. Measurement of Work, whether lump sum, Force Account, or unit price; <br /> 3. Acceptability of rates of progress on the Work; <br /> 4. Interpretation of Plans and Specifications; <br /> ' 5. Determination as to the existence of changed or differing site conditions; <br /> 6. Fulfillment of the Contract by the Contractor; <br /> 7. Payments under the Contract including adjustment; <br /> 1 <br /> 8. Suspension(s) of Work; <br /> 9. Termination of the Contract for default or public convenience; and <br /> 110. Approval of working or detail Plans and Submittals. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders from <br /> the City's Representative: <br /> 1 <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.