My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1. The City's Representative may use the City's resources, other contractors, or other <br /> means to accomplish the Work, and <br /> 2. The City will not be obligated to pay the Contractor, and will deduct from the <br /> 111 <br /> Contractor's payments, costs that result when other means are used to carry out <br /> the Contract requirements or City's Representative's orders. <br /> At the Contractor's risk, the City's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms, to carry out the City's Representative's <br /> orders, or to correct unsafe conditions of any nature; or <br /> 2. It is in the public interest. I <br /> The City's Representative and City shall have complete access to the Work and to the site <br /> of the Work and to the places where Work is being prepared or where materials, Equipment, <br /> and machinery are being obtained for the Work. If requested by the City's Representative or <br /> City, the Contractor shall provide the assistance necessary for obtaining such access, and <br /> shall provide information related to the inspection of construction. Absence of such access <br /> or information, as needed, may result in the City's refusal to accept the Work. <br /> The City's Representative has the authority to recommend Change Orders, but does not <br /> have authority to approve Change Orders. Proposed Change Orders are subject to review <br /> and approval by the City. No proposed Change Order or any change of Contract Sum or <br /> Contract Time is effective or binding upon the City unless and until the Mayor or its designee <br /> signs it, as authorized by City Council or by ordinance. <br /> To detail and illustrate the Work, the City's Representative may furnish to the Contractor <br /> additional drawings and explanations consistent with the original Plans. The Contractor shall <br /> perform the Work according to these additional drawings and explanations. <br /> The City's Representative may appoint assistants and inspectors to assist in determining that <br /> the Work and materials meet the Contract requirements. Assistants and inspectors have the <br /> authority to reject defective material and suspend Work that is being done improperly, subject <br /> to the final decisions of the City's Representative or, when appropriate, the City. <br /> Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material furnished <br /> that does not meet the Contract requirements shall be at the Contractor's risk and shall not <br /> be a basis for a Contract Claim even if the inspectors or assistants purport to change the <br /> Contract. <br /> Assistants and inspectors may advise the Contractor of any faulty work or materials or <br /> infringements of the terms of the Contract; however, failure of the City's Representative or <br /> the assistants or inspectors to advise the Contractor does not constitute acceptance or <br /> approval. <br /> 111 <br /> 1-05.3 Working Drawings <br /> Revise the second paragraph to read as follows: <br /> 1. Type 1 — Submitted for City information. Submittal must be received by the City a <br /> minimum of 7 working days before Work represented by the submittal begins. <br /> 2. Type 2 — Submitted for City review and comment. Unless otherwise stated in the <br /> Contract, the Engineer will require up to 15 working days from the date the Working <br /> Drawing is received until it is returned to the Contractor. The Contractor shall not proceed <br /> with the Work represented by the Working Drawing until comments from the Engineer <br /> have been addressed. I <br /> 3. Type 2E — Same as a Type 2 Working Drawing with Engineering as described below. <br /> 4. Type 3 — Submitted for City review and approval. Unless otherwise stated in the <br /> Contract, the Engineer will require up to 20 working days from the date the Working <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—60 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.