My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> • Washington Department of Wildlife , <br /> • Washington Department of Labor & Industries <br /> • Puget Sound Air Pollution Control Agency <br /> • Municipal Building Department <br /> • Municipal Planning Department <br /> • Municipal Public Works Department <br /> If the scope of Work in this Contract includes Work at the City of Everett Water Filtration <br /> Plant or the Waste Water Pollution Control Facility, Contractor shall comply with the <br /> requirements of the Washington Department of Labor & Industries for such work <br /> including, but not limited to, Chapter 296-67 WAC. All costs associated or incurred in <br /> complying with these regulations or any other regulations listed above are included in <br /> the Contractor's Proposal. <br /> In cases of conflict between different safety regulations, the more stringent regulation <br /> shall apply. <br /> The Washington State Department of Labor and Industries shall be the sole and <br /> paramount administrative agency responsible for the administration of the provisions of <br /> the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> The Contractor shall maintain at the project site office, or other well-known place at the <br /> project site, all articles necessary for providing first aid to the injured. The Contractor <br /> shall establish, publish, and make known to all employees, procedures for ensuring <br /> immediate removal to a hospital, or doctor's care, persons, including employees, who <br /> may have been injured on the project site. Employees should not be permitted to work <br /> on the project site before the Contractor has established and made known procedures <br /> for removal of injured persons to a hospital or a doctor's care. <br /> The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br /> the Contractor's plant, appliances, and methods, and for any damage or injury resulting <br /> from their failure, or improper maintenance, use, or operation. The Contractor shall be <br /> solely and completely responsible for the conditions of the project site, including safety <br /> for all persons and property in the performance of the Work. This requirement shall <br /> apply continuously, and not be limited to normal working hours. The required or implied <br /> duty of the Engineer to conduct construction review of the Contractor's performance <br /> does not, and shall not, be intended to include review and adequacy of the Contractor's <br /> safety measures in, on, or near the project site. <br /> Supplement 1-07.1 by adding the following: ' <br /> 1-07.1(1) Noise <br /> Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br /> a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br /> or holidays are subject to noise control requirements if the work generates decibel levels <br /> of greater than 55 db(A). Apply for a Noise Variance a minimum of 30 days prior to <br /> performing work and pay $100.00 application fee. Use the following link to obtain the <br /> latest information on noise variance requirements <br /> https://www.everettwa.gov/1547/Temporary-Noise-Variance-Requests. Typical <br /> requirements include, and not limited to, broadband backup alarms on all equipment <br /> requiring a backup alarm, anti-tail gate slamming devices, dump truck bed liners, and <br /> sawcutting, vacuum excavation, pavement breaking and loading export haul noise must <br /> be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays and between <br /> 8:00 a.m and 6:00 p.m. on weekends. Appendix E contains the City of Everett's Noise <br /> Ordinance for Bidder's reference. <br /> 1 <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—76 <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.