My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/12/31 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/12/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 11:32:41 AM
Creation date
1/7/2020 11:30:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/31/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 7 <br /> PROJECT TITLE: <br /> Amendment No. 1 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with CG Consent Contact Person Grant Moen <br /> Engineering, Inc. for Action Phone Number 425-257-8947 <br /> Stormwater Facility Access First Reading FOR AGENDA OF Dec. 31, 2013 <br /> Retrofit Grant Project,to Second Reading <br /> Extend Completion Date Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President r <br /> Location Preceding Action Attachments Department(s)Approval <br /> Various locations in Original contract starting <br /> south Everett. date April 5,2012. <br /> Amount Budgeted $99,750.00 <br /> Expenditure Required -0- Account Number(s): UT 3464 <br /> Budget Remaining $58,516.38 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Professional Services Agreement with CG Engineering provides structural engineering services to the <br /> City of Everett Public Works Department in support of the Department of Ecology grant funded Stormwater <br /> Facility Access Retrofit Project. The project will provide additional access ways to underground storm water <br /> vaults,underground storm water pipes, and storm water ponds. These additional access ways will allow for <br /> improved inspection and maintenance procedures, increased safety during maintenance procedures, and <br /> ultimately it will lead to improved water quality in areas downstream of these facilities. <br /> The City of Everett will be reimbursed for 75%of all costs incurred through the contract with CG <br /> Engineering that are in support of the Stormwater Facility Access Retrofit Project. <br /> Amendment No. 1 to the Professional Services Agreement with CG Engineering extends the completion date <br /> from December 31, 2013,to December 31,2014, at no additional cost <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 with CG Engineering Inc. for engineering services in support <br /> of the Stormwater Facility Access Retrofit Project and extend completion date to December 31, 2014 at no <br /> additional cost to the City. <br /> 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.