Laserfiche WebLink
Am GC/CM Contract <br /> General Contractor/Construction Manager Services for 2 <br /> �; Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> TABLE OF CONTENTS <br /> Article 1 - Definitions 2 <br /> Article 2 - The Contract Documents 5 <br /> Article 3 -Work of this Contract 5 <br /> Article 4 - Relationship of the Parties 10 <br /> Article 5 - Date of Commencement, Time of Completion, Liquidated Damages 11 <br /> Article 6 - Components of Total Contract Cost 12 <br /> Article 7 - Subcontracting 16 <br /> Article 8 -Additional Provisions 23 <br /> Attachment 1, "Summary Matrix of Cost Allocation" <br /> Attachment 2, "Phase Cl Total Contract Cost Summary" <br /> Attachment 3, "Detailed Breakdown of Total for Subcontract Costs" <br /> Attachment 4, "Detailed Breakdown of Negotiated Support Services" <br /> Attachment 5, "Subcontract Plan" <br /> Attachment 6, "General Conditions of the GC/CM Contract" <br /> Attachment 7, "Drawings" <br /> Attachment 8, "Specifications" <br /> Attachment 9, "Scope of Work for Bid Package #100 - Concrete Piles" <br /> City of Everett Page i December, 2013 <br /> Water Pollution Control Facility Expansion Table of Contents <br /> 9 <br />