My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> 417-4- <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> CITY OF EVERETT <br /> GC/CM CONTRACT <br /> WATER POLLUTION CONTROL FACILITY (WPCF) <br /> PHASE Cl (LIQUID STREAM) <br /> GENERAL CONTRACTOR/CONSTRUCTION MANAGER (GC/CM) <br /> THIS GENERAL CONTRACTOR/CONSTRUCTION MANAGER CONTRACT (GC/CM <br /> CONTRACT or CONTRACT) is made and entered into by and between the City of <br /> Everett (Owner), and IMCO General Construction, Inc. (GC/CM) hereinafter referred to <br /> as Parties. This Contract shall be effective on the last date set forth on the signature <br /> page. This Contract shall be the agreed basis of performing, and compensating for, all <br /> Work identified herein. <br /> In consideration of the mutual covenants and agreements of the Parties herein <br /> contained, the GC/CM agrees to furnish all material, labor, tools, equipment, apparatus, <br /> facilities, necessary to perform and complete in an acceptable manner all Work called <br /> for in the Contract Documents for the Water Pollution Control Facility — Phase Cl <br /> (Liquid Stream) ("Project") for a total not to exceed Total Contract Cost (TCC) shown <br /> below: <br /> Table 1: Total Contract Cost <br /> Phase Cl (Liquid Stream) <br /> Percent Fee Percentage of the MACC (3.8%) $59,409.80 <br /> Percent Fee Amount <br /> Fixed Amount for Specified General Conditions $126,275.00 <br /> Maximum Allowable Construction Cost (MACC) $1,563,389.53 <br /> Total for Subcontract Costs: $1,525,258.08 <br /> Negotiated Support Services: $0 <br /> Risk Contingency Account: $38,131.45 <br /> Total Contract Cost (without sales tax): $1,749,074.33 <br /> City of Everett Page 1 of 25 December, 2013 <br /> Water Pollution Control Facility Expansion <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.