My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 5 <br /> PROJECT TITLE: <br /> Bid award for the Evergreen Briefing COUNCIL BILL # <br /> Way and Pecks Drive- Proposed Action Originating Department Public Works <br /> Intersection Safety project Consent Contact Person Ryan Sass,PE <br /> Action Phone Number 425-257-8942 <br /> First Reading FOR AGENDA OF 1/22/2014 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President WcTh <br /> Location Preceding Action Attachments Department(s)Approval <br /> Evergreen Way and 10/2/13 Council Bid Summary Public Works <br /> Pecks Drive authorized call for bids Vicinity Map <br /> 9/25/2013 Council <br /> briefing <br /> Amount Budgeted $256,905.09 <br /> Expenditure Required $256,905.09 Account Number(s): PW 3544 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Bids for the Evergreen Way and Pecks Drive-Intersection Safety project were opened on January 7,2014, <br /> with seven(7)bid proposals received for the construction project. The lowest responsive and responsible <br /> bidder, Faber Construction Corp. submitted a bid for$256,905.09. <br /> This project will construct pedestrian and traffic signal safety improvements at the intersection of Evergreen <br /> Way and Pecks Drive. The improvements include left turn arrows,new traffic signal poles,traffic signal <br /> backplate visibility improvements,accessible pedestrian signals, street lighting improvements,pavement <br /> marking improvements,and ADA curb ramps. <br /> The funding source for this project is: <br /> Federal HSIP Grant $256,905.09 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award the construction contract for the Evergreen Way and Pecks Drive-Intersection Safety project to Faber <br /> Construction Corp. in the amount of$256,905.09 including Washington State Sales Tax and at no cost to the <br /> City. <br /> • <br /> 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.