Laserfiche WebLink
3 <br /> BID SUMMARY <br /> Evergreen Way & Pecks Drive Intersection Safety <br /> W.O.# 3544 <br /> Date 1/7/2014 <br /> For: Corey Hert, Project Engineer <br /> Bidder Name: Bidder Totals: <br /> ENGINEER'S ESTIMATE $277,719.00 <br /> Faber Construction Corp $256,905.09 <br /> Trinity Contractors $263,572.00 <br /> Kamins Construction $267,292.45 <br /> Bianchi Construction $309,206.20 <br /> Elcon Corporation $315,924.35 <br /> Totem Electric of Tacoma $326,986.70 <br /> Westwater Construction $354,045.00 <br /> Bidder#8 $0.00 <br /> 68 <br />