My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> BID SUMMARY <br /> Evergreen Way & Pecks Drive Intersection Safety <br /> W.O.# 3544 <br /> Date 1/7/2014 <br /> For: Corey Hert, Project Engineer <br /> Bidder Name: Bidder Totals: <br /> ENGINEER'S ESTIMATE $277,719.00 <br /> Faber Construction Corp $256,905.09 <br /> Trinity Contractors $263,572.00 <br /> Kamins Construction $267,292.45 <br /> Bianchi Construction $309,206.20 <br /> Elcon Corporation $315,924.35 <br /> Totem Electric of Tacoma $326,986.70 <br /> Westwater Construction $354,045.00 <br /> Bidder#8 $0.00 <br /> 68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.