Laserfiche WebLink
• <br /> t`-- <br /> Run Date: 1/2/2014 <br /> City of Everett-Public Works Department Cutoff Date: 12/20/2013 Contract Estimate Voucher i <br /> Time: 1:45 PM For Work Order#3314B <br /> Contractor: TRI STATE CONSTRUCTION <br /> Project:274 Estimate#24 3686 <br /> PO <br /> 41st Street Extension and Roundabout PO BOX WA 98009 3606 <br /> • WO 3314B BID:$570,768.76 <br /> TOTAL BID:$6,366,423.06 <br /> Total Amt Previous Amt Present Amt <br /> Contract Totals to Date $600,635.83 $585,916.72 $14,719.11 <br /> • <br /> Retained Amounts $30,031.763 ! $29,295.82 $735.96 <br /> State Tax Amounts $0.00 $0.00 $0.00 , <br /> Amounts Paid $570,604.05 $556,620.go <br /> Amount to be Paid This Estimate $13,983.15 <br /> \i/() in <br /> O <br /> T <br /> Checked By ae 5 /Cc. kavj 2t r3oriir.' Date /,,3//4 <br /> Recommended By gel,l7'u - _ Date //,(// <br /> Public Works Director /( -Z( Date i 'j f <br /> RECORD DRAWING CHECKOFF I <br /> Inspector: Date: ——. <br /> FINAL <br /> Contractor: Data: . <br /> Work Order Number: 3314B <br />