Laserfiche WebLink
Run Date: 1/2/2014 City of Everett-Public Works Department Cutoff Date: 12/20/2013 <br /> Time: 1:45 PM Contract Estimate Voucher <br /> Project: 274 For Work Order#3314B Contractor: TRI STATE CONSTRUCTION <br /> 41st Street Extension and Roundabout Estimate#24 PO BOX 3686 <br /> WO 33148 BID:$570,768.76 BELLEVUE WA 98009-3686 <br /> TOTAL BID:$6,366,423.06 <br /> Unit Plan Total Previous Present Total Previous Present <br /> item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Roadway Surveying LS 4,000.00 1.00 1.0000 1.0000 0.0000 4,000.00 4,000.00 0.00 <br /> 0002 Mobilization LS 7,000.00 1.00 1.0000 1.0000 0.0000 7,000.00 7,000.00 0.00 <br /> 0003 Structure Excavation CL.B,Incl Haul CV 16.00 1,970.00 2,612.8000 . 2,612.8000 0.0000 41,804.80 41,804.80 0.00 <br /> 0004 Soling or Extra Excavation CL.B • SF 0.50 11,100.00 14,393.0700 14,393.0700 0.0000 7,196.54 7,196.54 0.00 <br /> 0005 Testing Storm Sewer Pipe LF 2.00 1,810.00 1,662.0000 1,662.0000 0.0000 3,324.00 3,324.00 0.00 <br /> 0006 Schedule A Storm Sewer Pipe,12-Inch LF 27.00 1,020.00 968.5000 968.5000 0.0000 26,149.50 26,149.50 0.00 <br /> Diameter <br /> 0007 Schedule A Storm Sewer Pipe,18-inch LF 32.00 140.00 136.0000 136.0000 0.0000 4,352.00 4,352.00 0.00 <br /> Diameter • <br /> 0008 Schedule A Storm Sewer Pipe,24-Inch LF 55.00 650.00 884.0000 884.0000 0.0000 48,620.00 48,620.00 0.00 c0 <br /> Diameter 0 <br /> 7- <br /> 0009. Concrete Inlet EA 900.00 1.00 2.0000 2.0000 0.0000 1,800.00 1,800.00 0.00 <br /> 0010 Catch Basin Type 2,48-Inch Diameter EA 2,570.00 20.00 22.0000 22.0000 0.0000 56,540.00 56,540.00 0.00 <br /> 0011 Scupper EA 1,000.00 19.00 19.0000 19.0000 0.0000 19,000.00 19,000.00 0.00 <br /> 0012 Connect to Existing Storm Sewer Drain Pipe EA 1,500.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0,00 <br /> 0013 Stormwater PreTreatment&Flow Splitter LS 45,000.00 1.00 1.0000 1.0000 0.0000 45,000.00 45,000.00 0.00 <br /> 0014 Stormwater Treatment Facility LS 310,000.00 1.00 1.0000 1.0000 0.0000 310,000.00 310,000.00 0.00 <br /> 0015 Force Account FA 1.00 5,000.00 2,797.8800 2,797.8800 0.0000 2,797,88 2,797.88 0.00 <br /> 0016 Connect to Existing Catch Basin EA 2,500.00 1.00 1.0000 1.0000 0.0000 2,500.00 2,500.00 0.00 <br /> 0017 Field Directive No.10 Material&Handling Cost LS 2,935.15 1.00 1.0000 1.0000 0.0000 2,935.15 2,935.15 0,00 <br /> 0018 Crushed Surfacing Base Course TN 23.50 125.00 123.2700 123.2700 0.0000 2,896.85 2,896.85 0.00 <br /> 0019 Renegotiation of Overruns Quantities LS 14,719.11 1.00 1.0000 0.0000 1.0000 14,719.11 0.00 14,719.11 <br /> 0200 MOH HDPE Storm Sewer Pipe 12"Diameter DOLLA 1.00 7,488.00 0.0000 .0.0000 0.0000 0.00 0.00 0.00 <br /> 0201 MOH HDPE Storm Sewer Pipe 18"Diameter DOLLA 1.00 2,299.20 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> •0202 MOH HDPE Storm Sewer Pipe 24"Diameter DOLLA 1.00 3,066.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> • 0203 MOH Stormwater Treatment Facility DOLLA 1.00 4,394.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0204 MOH HDPE Storm Sewer Pipe 24"Diameter DOLLA 1.00 14,308.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> tom" <br />