My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/05 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:02:26 AM
Creation date
1/21/2020 10:27:58 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.14t*Ot::. 11rSLSEIniproyementskie Ave:g <br /> • <br /> 'ChangeNdo7...No,4 <br /> change Order afeCtive Date: January.215.2014 <br /> CONTRAOCIRs; • <br /> s: <br /> . ____ pate: 77f .,LT. 21 zo1 -1 <br /> Officer <br /> . . . . . . . . <br /> Exhibit <br /> A— Description Of Changed <br /> -Sehedule.A WM*ChareS <br /> 4dded..13altem. <br /> Change Order No..4 adds five p new bid items to the Schedtde A portion of theic011t1:44 as listed <br /> heloW. <br /> Bid Item A99—Adjusted Unsuitable Poundatiou. Add bid item A99 entitled,'Adjusted Unsuitable <br /> Foundation', at the agreed upon unit price of$15.87/CY,for:a quantity increase-of110 cubic yards of <br /> "Adjusted Unuitable Founclatioe;for:atotal contractprice increase of$11,26730, <br /> Bid IlenTi MOO BottOW. Add-b.fd item A100 entitled,"Adjusted•Gravel13Mirow", <br /> atthe agreed upon unit price,of$5.6.5/Ton,for a quantity illtrege;of 2,155.60 tons of"Adju$ted <br /> Gravel Bonow'A for.a•total ContraCt price increaseof$12,1'0265: <br /> Bid item A101—Adjusted Ci ushed Surfacing Top Course. Add bid item Al 01 entitled,"Adjusted <br /> Crushed Surfacing Top COW,at the agreed 14)0 unit price of$31.00/Ton,for a quantity iiie-reae of <br /> $01.0 tons of"Adjusted Crushed-Surfacing Top-Course"for a total contract price increaseof <br /> 5,548.36. <br /> 131(1 Iteib A102—Adjusted 48' Type 2 CB. Add bid item M.02 Ontitle„d,"Adjusted 48"Type2'CB", <br /> atitho agoeslupOnliiiit price of$65.81/EA,for a quantity inaea8e of 2 each Of"Adjusted 48"Type 2. <br /> Mt?for a totatcArtiract price increase of$131.74. <br /> • <br /> Bid Item A103—Dual Faced Sloped Mountable Curb: Add bid item A103 entitled,"Dual Faced <br /> Sloped Mountable r:the agreed tipinitiftit price of$3.1.94/LFy for a,g;p12ntity increase of 221) <br /> feet of"Dual Faced Sloped Mbuirtabte Curb'fota tOtal contratt price inereaSe $7,026;80. <br /> Page 3 616. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.