My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/05 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:02:26 AM
Creation date
1/21/2020 10:27:58 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 , <br /> Project: 112th St. SE Improvements(14th Ave SE to SR 527) 1 <br /> Change Order No. 4 <br /> Change Order Effective Date: January 21,2014 <br /> Schedule B Work Changes <br /> Added Bid Items <br /> Change Order No.4 adds three(3)new bid items to the Schedule B portion of the contract as listed <br /> below. <br /> Bid Item B39—Adjusted Cold Mix Patch. Add bid item B39 entitled,"Adjusted Cold Mix Patch", <br /> at the agreed upon unit price of($26.56/Ton),for a quantity of 339.74 tons of"Adjusted Cold Mix <br /> Patch"for a total contract price decrease of$9,023.49. <br /> Bid Item B40—Adjusted 6"DI Pipe. Add bid item B40 entitled,"Adjusted 6"DI Pipe",at the <br /> agreed upon unit price of$21.33/LF,for a quantity increase of 84.5 tons of"Adjusted 6"DI Pipe",for <br /> a total contract price increase of$1,802.39. <br /> Bid Item B41—Adjusted Crushed Surfacing Base Course. Add bid item B41 entitled,"Adjusted <br /> Crushed Surfacing Base Course",at the agreed upon unit price of$2.87/Ton,for a quantity increase of <br /> 36.23 tons of"Adjusted Crushed Surfacing Base Course"for a total contract price increase of$103.98. <br /> Schedule A Work Changes <br /> Modified Bid Items <br /> Change Order No. 4 modifies five(5)existing bid items to the Schedule A portion of the contract as <br /> listed below. <br /> • <br /> Bid Item Al—Minor Change. Modify bid item Al entitled,"Minor Change",to provide additional <br /> public improvements using contract required force account rates for work outside the scope of the <br /> contract,for an estimated increase to the contract in the amount of$48,915.23. <br /> Bid Item A16—Structure Excavation Including Haul,CL A. Modify bid item.A16 entitled, <br /> "Structure Excavation Including Haul, CL A",at the agreed upon unit price of$70.00/CY,for a <br /> quantity increase of 601.10 cubic yards of"Structure Excavation Including Haul, CL A"for a total <br /> contract price increase of$42,077.00. <br /> Bid Item A17—Gravel Borrow,Including Haul. Modify bid item All entitled, "Gravel Borrow, <br /> Including Haul",at the agreed upon unit price of$11.65/Ton,for a quantity increase of 2,230.69 tons <br /> of"Gravel Borrow,Including Haul"for a total contract price increase of$25,987.54. <br /> Bid Item A54—Existing Private Improvement Restoration. Modify bid item A54 entitled, <br /> "Existing Private Improvement Restoration",to provide additional private improvements using <br /> contract required force account rates for work outside the scope of the contract,for an increase to the <br /> contract in the amount of$28,429.38. <br /> Page 4 of 6 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.