My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/12 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 12:00:48 PM
Creation date
1/21/2020 11:54:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/12/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 , <br /> r 2i 07 COLEY AVE,S i E 900,EVERET.T,WA 9S20I <br /> Rd <br /> pdi.Eet 1 <br /> 1.800,615.9900 425.2527700 Tax:425.339.6018 vwrw,pereeetcon <br /> SCOPE OF SERVICE <br /> INTRODUCTION <br /> This project will provide for survey and mapping services on the Snohomish River in the vicinity of the <br /> SRS overcrossing and adjacent upland areas to facilitate design work URS Corporation is performing for <br /> the City of Everett. <br /> Task I —Project Management <br /> Monthly invoices will be prepared and submitted to the client Project Manager. The Consultant Project <br /> Manager will notify URS, in writing(memo format), of any out of scope and/or budgetary issues that are <br /> inconsistent with this Scope of Work. <br /> Work Elements: <br /> • Prepare Work Plan <br /> • Prepare project schedule and updates <br /> • Prepare monthly invoices <br /> Task 2—Survey&Mapping <br /> This survey work will include five Snohomish River cross sections and an adjacent upland area as <br /> directed by URS. One additional day of fieldwork and associated mapping is included as an optional item. <br /> Work Elements: <br /> • Recover project control coordinates and establish additional control for the survey <br /> • Establish horizontal and vertical control necessary for the topographic survey of the site <br /> • Edit and process survey control <br /> • Conduct five river cross section surveys at the locations determined by URS, from the west <br /> shore to the east shore, in the vicinity of the I-S overcrossing of the Snohomish River <br /> • Conduct a topographic survey of an upland area determined by URS in the vicinity of the cross <br /> sections, picking up ground natural and artificial features; manholes with pipe size, material, <br /> invert, and direction information; significant trees and other features as directed by URS <br /> • Prepare I"=20',one foot contour survey map in AutoCAD 2009 with Carlson Survey software <br /> Assumptions: <br /> • Accurate property boundaries of the site will not be required <br /> • Contours will be generated for the upland area only <br /> • Elevations will be referenced to the NAVD88 vertical datum <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.