Laserfiche WebLink
• <br /> • 2 <br /> • <br /> 2707 COLBY AVE,STE 500,EVER�E i f,WA 98201 <br /> Perteet <br /> ? 124615.5200 425227700 fax:425.339.6018 trww.pere tcon <br /> • The horizontal datum will be a City of Everett local coordinate system, derived from <br /> NAD83(199I) state plane coordinates, utilizing a combined scale factor used in previous <br /> mapping products done by Perteet in the project area <br /> • URS will make available to Perteet, Inc. prior to the beginning of fieldwork the location of the <br /> cross sections and upland topographic survey area. It is anticipated the upland topographic <br /> survey will be of a small enough area to be completed in one day; Perteet, Inc. reserves the right <br /> to review this proposal if the upland survey area exceeds one day's work <br /> • One additional day of fieldwork and associated mapping is included in this proposal, beyond the <br /> river cross sections and upland work, if needed by URS. <br /> Deliverables: <br /> • Topographic survey map-PDF file and paper copy <br /> • Points file in text format <br /> Time for Completion: <br /> Task 2 will be completed in 21 calendar days from issuance of the Notice to Proceed. Task I will <br /> continueuntil the project is closed by Perteet. <br /> 29 <br />