Laserfiche WebLink
• <br /> 2 <br /> WEST Staff Ii <br /> • _ Principal I Project I Senior I Staff I 5151 I Other Total <br /> _Tasks I Manager II Engineer II II Engineer Technician I Clerical Costs Costs <br /> RetesN»url S 216331$ 175.90 I S 129.05 Is 110.26 I$ 72.363 1$ 58.75 I <br /> Task 1.Data Collection _ <br /> 1.1 Data Collection and Review 2 4 0 - $ 793 <br /> 12 Field Data Sampling Plan 2 4 $ 793 <br /> Task 2.Geomorphic Assessment I <br /> 2.1 Site Geomorphic Review 11 2 8 al $ 2,029 <br /> Task 3.Development of 243 Sediment Transport Model <br /> 3.1 Field Reconnaissance 4 4 1 $ 100 $ 1,203 <br /> 3.2 Hydrology 1 2 12 4 $ 2,047 <br /> 3.3 Update 1•D HEC-RAS Hydraulic Model 2 8 16 16 $ 4,387 <br /> 3.4 2-0 Model Development and Calibration 6 80 20 _ S 11,676 <br /> 3.5 Sediment Transport Simulation _ 8 40 $ 5,818 <br /> 3.6 Model Results Analysis 2 8 56 40 $ 10,909 <br /> 3.7 Documentation 2 12 40 2 $ 7,072 <br /> I I I I $ - <br /> Total Hours 7$ 1,514 $ 8,267 I S 1,290 I$ 29,7 2641 88 3 0 $ 6,368 $ 176 $ 100' <br /> Total Cost S 46,826 <br /> • <br /> • <br /> • <br /> WEST scope and costs for Outfall 025 Hydrodynamic and Sediment Transport Modeling 6 <br /> 10/15/2013 <br /> 37 <br />