My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/19 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 9:24:00 AM
Creation date
1/23/2020 9:17:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Amendment No. 1 to GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase C1 (Liquid Stream) <br /> A. If a Change Order or Project Contingency Reallocation, whether arising <br /> from a Work Change Directive, a GC/CM Request for Change Order, or a <br /> Change Order Proposal, provides for an adjustment to the TCC (or a reallocation <br /> within the TCC via a Project Contingency Reallocation), the adjustment shall be <br /> based upon one of the following methods: <br /> V. Attachment 6 to the Contract, General Conditions, Section 14.01 A is amended <br /> to read as follows: <br /> A. Owner shall pay GC/CM a sum not greater than the Total Contract Cost <br /> for performance of the Work, in accordance with the Contract Documents, <br /> provided that a Project Contingency Reallocation is required before payment of <br /> any Project Contingency funds in the Total Contract Cost. The Total Contract <br /> Cost shall include all taxes imposed by law and properly chargeable to the <br /> Project, excluding sales tax. <br /> City of Everett Page 9 of 10 March 3, 2014 <br /> Water Pollution Control Facility Expansion <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.