My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/19 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 9:24:00 AM
Creation date
1/23/2020 9:17:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 1 to GC/CM Contract <br /> dd <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> D. Reports: (i) Produce periodic reports of progress of the Work and of <br /> GC/CM's compliance with the Progress Schedule and Schedule of Submittals; <br /> and (ii) draft proposed Change Orders, Work Change Directives, Project <br /> Contingency Reallocations, and Field Orders, obtain backup material from <br /> GC/CM as appropriate. <br /> Q. Attachment 6 to the Contract, General Conditions, Section 10.01 A is amended <br /> to read as follows: <br /> A. Changes in the Work may be accomplished after execution of the Contract, <br /> and without invalidating the Contract, solely by Change Order, Project <br /> Contingency Reallocation, or Work Change Directive. <br /> R. Attachment 6 to the Contract, General Conditions, Section 10.01 D is amended <br /> to read as follows: <br /> D. Owner Change Order Proposal: Change requests may be initiated by <br /> Owner through a Change Order Proposal submitted to GC/CM. Such a request <br /> is for information and pricing only, and is not an instruction to execute changes, <br /> nor to stop work in progress unless issued as a Work Change Directive or Project <br /> Contingency Reallocation. Proposal will include: <br /> S. Attachment 6 to the Contract, General Conditions, Section 10.01 D 5 is amended <br /> to read as follows: <br /> 5. Upon receipt of the Change Order Proposal, the GC/CM shall promptly submit <br /> its proposed costs and pricing. If Owner and GC/CM agree to the terms of the <br /> cost and pricing for the proposed change, they shall execute a mutually <br /> acceptable Change Order or Project Contingency Reallocation to authorize the <br /> work. <br /> T. Attachment 6 to the Contract, General Conditions, Section 10.02 C 1 c is <br /> amended to read as follows: <br /> c. The Owner authorizes use of the Project Contingency through a Project <br /> Contingency Reallocation. <br /> U. Attachment 6 to the Contract, General Conditions, Section 10.04 A is amended <br /> to read as follows: <br /> City of Everett Page 8 of 10 March 3, 2014 <br /> Water Pollution Control Facility Expansion <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.