Laserfiche WebLink
ENGINEERING <br /> PUBLIC SERVICES DEPARTMENT <br /> September 5, 2017 <br /> Dilan Dean <br /> ddean@raymondhandling.com <br /> Raymond Handling Concepts <br /> 3500 W Valley Hwy N, STE 101 <br /> Auburn, WA 98203 <br /> RE: Owner: Umbra Cuscinetti, Inc <br /> Job Address: 6707 Hardeson Rd <br /> Plan Check Number: B1708-042 <br /> Dear Mr. Dean, <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. These comments address building issues only. Additional <br /> revisions or additions may be required by other departments (such as Public Works, Planning, or <br /> Fire). All references refer to the 2015 International Building Code (IBC), as amended by the State <br /> of Washington and adopted by the City of Everett. The current IBC referenced standard for <br /> accessible design is the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). <br /> Federal ADA regulations and standards may be more restrictive. All required submittals must be of <br /> sufficient detail and information to ensure that the proposed structure will be constructed in <br /> compliance with all adopted codes. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of construction documents <br /> reflecting the corrections requested. All revisions require the person delivering the <br /> drawings to replace the revisions into the two sets here at our offices. For significant <br /> revisions, or if the revisions are coming directly from a document printing facility, <br /> please make arrangements with them to print and deliver two replacement sets. <br /> Structural <br /> 1. It appears that on page 3 of the permit calculations, the full operating weight of the <br /> equipment is not being considered. Please confirm with the installer as to the maximum <br /> operating weight of the equipment to design the anchorage. <br /> 2. On page 4 of the permit calculations, it appears that the seismic coefficient obtained uses <br /> an R factor of 2.5, please identify the seismic force resisting system as indicated by Table <br /> 12.2-1 of ASCE 7-10. Otherwise, if the lateral system is not classified under Chapter 12, <br /> please indicate the procedure used to obtain the forces. Also, it appears that you are <br /> arbitrarily reducing the seismic coefficient by a factor of 1.4. If the factor is used to obtain <br /> allowable—level of design forces. Please clarify as this is not typical of concrete related <br /> connections. <br /> Page 1 of 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8: <br />