|
'`4
<br /> �i O MECHANlCAL NOTES: -�
<br /> � 1. DUCT MATERIAL IS 26 GA. GALV. AND FLEX DUCT. DUCTWORK SHALL BE SUPPORTED PER 2015 IMC
<br /> WAC CHAPTER 6. SECTION 603
<br /> 2. MATERIAL iN DUCTS SHALL HAVE A FLAME SPREAD INDEX OF LESS THAN 25, SMOKE DEVELOPMENT
<br /> OF 50 PER 2015 iMC WAC CHAPTER 6. SECTION 602
<br /> 3. LOW PRESSURE DUCT SYSTEMS SHALL HAVE LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS AND
<br /> CONNECTIONS OF SUPPLY AND RETURN DUCTS AND PLENUMS SECURELY FASTENED AND SEALED WITH �
<br /> WELDS, GASKETS, MASTICS (ADHESIVES), MASTIC-PLUS EMBEDDED-FABRIC SYSTEMS OR APPROVED TAPES • .
<br /> INSTALLED IN ACCORDANCE WITH 2O15 IMC WAC CHAPTER 6 SECTION 603.9.
<br /> CD-1 CD-1
<br /> 10" 10" 4. WHEN ISOLATION SLEEVES ARE USED AT LINE C�NNECTIONS TO PLENUMS, THEN THEY SHALL COMPLY .
<br /> WITH IMC CHAPTER 6 .
<br /> WALL MOUNT
<br /> 72� ,o\ ,O RETURN 5. 10" DIFFUSERS WtTH NO MANUAL DAMPERS. USE FLOW CONTROLS AT WYES, TYPICAL AS NOTED ON PLAN
<br /> � O � 2 6. MINIMUM OUTSIDE AIR VENTILATION PER 2015 IMC WAC CHAPTER 4, TABLE 4p3.3.1.1. •
<br /> ^ 7. OUTSIDE AIR DAMPERS SHALL COMPLY WITH 2O15 WSEC, SECTION C403.2.4.3.
<br /> 10 12 HP-� .
<br /> 0�1� 8. SINGLE PACKAGE UNITARY FAN COOLWG UNITS HAVING A TOTAL COOLING CAPACITY OF GREATER THAN
<br /> 2'1 o T TCURBF 20,000 Btu/h REQUIRE ECONOMIZERS PER WSEC 403.3. EXCEPT AS PERMITTED BY C403.3 EXCEPTION 1 �
<br /> O - - - - - - - - - � - - - - - - . •
<br /> SUPPLY PLENUM
<br /> #Pws�3� MECHANICAL NOTES: (cont.)
<br /> OCCUPIED SET POINT MECHANICAL EQUIPMENT INSTALLATION IN OR ON THIS BUILDING SHALL BE IN ACCORDANCE WITN -
<br /> TO BE CONTROLLED BY THE REQU�REMENTS OF THE 2015 IMC WAC CHAPTER 6.
<br /> nLiGHT OCCUPANCY
<br /> SENSORS ROUND FLEX DUCT SHALL BE U.L. LISTED CLASS 1, STANDARD 181 - FACTORY MADE AIR DUCTS AND AIR
<br /> CONNECTORS. MEASURED IN ACCORDANCE TO ASTM C 518 OR ASTM C 177 AT 75DEG F MEAN �
<br /> TEMPERATURE. INSTALLATION SHALL BE W ACCORQANCE WITH MANUFACTURES WSTALLATION INSTRUCT�ONS
<br /> CD-1 CD-1
<br /> �� ���� MECHANICA� DRAWINGS SHOW DUCTWORK SIZES TO BE CLEAR INSIDE DIMENSION. '
<br /> DUCT INSULATION SHALL COMPLY WITH 2O15 IMC WAC CHAPTER 6, SEC. 604. ; �
<br /> � ���
<br /> ELECTRICIAN MUST VERIFY ALL ELECTRICAL REQUIREMENTS AND LOCATIONS.
<br /> THERMOSTAT SCHEDULING TO BE PERFORMED ON SITE BY OTHERS. �
<br /> ALL MVAC EQUIPMENT LEAVES FACTORY WIRED FOR 240 VOLT OPERATION
<br /> OTHE ACCEPTABLE OPERATING RANGE FOR THE 240V & 208V TAPS ARE;
<br /> C TAP RANGE
<br /> 24-0 253-216 .
<br /> M EC HAN I CRL P LAN 208 220_�8� .
<br /> 1/4" = 1'-0" SITE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR MAKING SURE THE RIGHT TAP IS CONNECTED FOR ,
<br /> THE APPLIED SITE VOLTAGE.
<br /> MINIMUM VENTILATION RATES PER IMC SECTIC7N 403 AIR FILTERS IN HVAC UNITS OR SYSTEMS ARE TO BE CHANGED EVERY 30 DAYS BY OTHERS QN SITE.
<br /> Rp .
<br /> room# name Az (sf} sf/1000 Occ. Dens Pz(calc) Pz(used) (cfm/person) Ra(cfm/sf) Vbz(cfm) REGISTER AIR FLOW TEST AND BALANCE OF HVAC SYSTEM TO BE PROVIDED AND PERFORMED BY OTHERS ON SITE.
<br /> 1 Classroom 817 0.817 35 29 29 10 0.12 388
<br /> 388cfm HVAC SITE CONTRACTOR IS RESPONSIBLE FOR BALANCING THE SYSTEM. (2015 IMC WAC 403.3.3.1.5) .
<br /> Az=room area(sf)
<br /> Occ. Dens=occupant density(from Table 403.3) ,
<br /> Pz(calc) =zone popufation or occupant quantity(calculatedj
<br /> Pz(used) =zone population or occupant quantity(user can override the calculation-increase only) ' �
<br /> Rp=people outdoor airFlow rate in breathing zone (cfm/person) -
<br /> Ra=area outdoor airflow rate in breathing zone (cfm/sf)
<br /> Vbz=Breathin zone outdoor airflow rate er eq.4-1( R *Pz+Ra*Az)
<br /> PACKAGE *SPVU* HIGH EFFICIENCY WALL MOUNT HEAT PUMP - SCHEDULE
<br /> DOAS/ERV/E�ECTRICAL 1Q DOAS/ERV/ELECTRICAL Q COOLING CAPACITY 3Q HEATING CAPACITY � DOAS UNIT HEAT STRIPS
<br /> ENERGY RECOVERY ELECT. INFORM. C . INFORM.
<br /> DOAS LQW VENTILATION MODE FULL VENTILATION MODE ELEC. ELEC. OPER.
<br /> COMP TOTAL ECON. COOL SENS. COOL SENS. HTG HTG OUTDOOR '
<br /> BARD TYPE CFM BLR. 100% ERV ECM ECM OUTSIDE ENT ENT CAP. CAP. CAP. CAP. OUTSIDE CAP. CAP. SUMMER �B/WB HRS HRL WINTER INDOOR WHR HEAT HEAT WGT. ADDITIONAL
<br /> TAG QTY MODEL # TONS SCROLL NOM. TYPE. FREEFLOW OSA V-PH ERV BLOWER V-PH ERV BLOWER DB DB WB EER IPLV BTUH BTUH BTUH BTUH DB COP BTUH BTUH EFFICIENT DEG'S BTUH BTUH EFFICIENT DB MOP V-PH MCA MOP CKT V-PH MCA BTUH CKT KW BTUH LBS. REMARKS
<br /> PART/FUl VENTIL. MOTOR .MOTOR PART LOAD PART lOAD FULL LOAD FULI tOAD � PART/LOAD FULL/LOAD � � � �
<br /> 750 388 AMPS-1.3 AMPS-.87 AMPS-2.2 AMPS-1.74 � •
<br /> HP-1 1 C36HA-A10ZP4XXR 3 2-STAGE ���Q ECM NO 450 230�� WATTS-296 WATTS-95 230�� WATTS-497 WATTS-192 95 80 67 11.0 14.5 23.4K 18.5K 35K 26.3K 47 3.3 22.7K 31K 65� 95/70 6,318 1,711 80� 1,711 23,328 230/1 27 40 A 240/1 52 60 B 10 34;130 678 1, 2, 3, 4, 5, 6, 7, 8 �
<br /> ADDITIONA� REMARKS; c3sH� The sequence of operation for the Integrated DOAS s sY tem•
<br /> 2 - INCLUDE BARD WALL CURB #TCURBF3642A-4. ERV Wqtts - Low 296 Watts Blower Full Load 192 Watts 1. Upon a call from the occupancy sensor the(DOAS) ERV and the indoor(ECM)motor will
<br /> 3 - THERMOSTAT, BARD # 8403-060, 7-DAY PROGRAMMAB�E. ERV Am s - Low 1.3 Am s Blower Full Lood 1.74 Am s start in low vent mode and ventilate the space continuously as oceupied.
<br /> 4 - WALL CO2 SENSOR. #8403-067 ERV CFM - Low 300 CFM Blower Part Load 95 Watts Note: 1 on the HVAC Schedule.
<br /> 5 - OCCUPANCY SENSOR, (SUPPLIED BY BLAZER) ERV Watts - Med 415 Watts Blower Part Load 0.87 Am s 2, Upon a call from the CO2 sensor the(DOAS)ERV and the indoor(ECM)motor will
<br /> 6 - GPS (FIELD INSTALLED CONTROL KIT). ERV Am s - Med 1.$ Am s
<br /> � - 2" FILTER. ERV CFM - Med 375 CFM Com ressor Full 2588 Watts change to full vent mode and ventilate the space until the CO2 sensor is satisfied and then •
<br /> 8 - ERV (DOAS) ENERGY RECOVERY. ERV Watts - Hi 497 Watts Com ressor Full 11.46 Am s revert back to the low vent mode during the occupied time. �
<br /> 9 - UNIT COLOR IS *BUCKEYE GRAY* ERV Am s - Hi 2.2 Am s Com ressor Part 1734 Watts Note: 2 on the HVAC Schedule.
<br /> 10 - PRE WSTALLED OUTDOOR THERMOSTAT, SET AT 40DEG'S. ERV CFM - Hi 450 CFM Com ressor Port 7.99 Am s 3. The Heating and Cooling section will only work if there is a Heating or Cooling call from ,
<br /> *� M.C. TO REFER TO INSTALLATION INSTRUCTIONS FOR START UP AND EQUIPMENT SET. Outdoor Fan 38o Watts the thermostat. This action works entirely independent of the DOAS ventilation portion.
<br /> ** M.C. TO CHECK SITE VOLTAGE AND SET CORRECT TAP ON TRANSFORMER. Outdoor Fan 1.67 Am s Note: 3&4 on the HVAC Schedule. .
<br /> ** M.C. TO SET AND PROGRAM THERMOSTAT PER CUSTOMERS REQUiREMENTS. 4. This action will keep repeating itself as required by the occupancy sensor, CO2 S@t150f '
<br /> and Room Thermostat. ,
<br /> 8-18-17 REVISE HEAT PUMP SCHEDULE,ADD SEQUENCE OF OP, RMS COPYRIGHT 2017, BLAZER INDUSTRIES, INC. � MODULAR C/assroom for., Approved for Const: Job No: �J031
<br /> 9-6-17 ADD SUPPLY PLENUM NUMBER (#PWS131) LDG THIS MATERIAL IS THE EXCLUSIVE PROPERIY .
<br /> OF BLP,ZER INDUSTRIES, INC.AND SHALL ■� File Copy:
<br /> NOT BE REPRODUCED, USED,OR DISCLOSED - 2$ X 32 KC DA - Eve rett S�D■
<br /> �� INQUSTRIES,WC.
<br /> TO OTHERS EXCEPT AS AUTHORIZED BY THE �� wwv,,.blazerind.com Drawn By: LDG �
<br /> DATE REVISION BY WRIITEN PERMISSION OF BLAZER INDUSTRIES. �� P.O.BOX 489 ■ Aumsville,OR 97325-0489 WA. GOLD Pacific Mobile 17 BLMP-04 A9 WA Issue�ate: 9-6-97
<br />
|