My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3311 WAVE DR 2020-01-30
>
Address Records
>
WAVE DR
>
3311
>
3311 WAVE DR 2020-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:31:59 PM
Creation date
1/30/2020 3:31:14 PM
Metadata
Fields
Template:
Address Document
Street Name
WAVE DR
Street Number
3311
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electric Permit for 3311 Wave Drive <br /> Per the permit electrical plan review is not required because it fits the following: <br /> • (i) Low voltage systems; <br /> o [Re-wire doorbell from a removed to a new wall]. <br /> • (ii) Lighting specific projects that result in an electrical load reduction on each feeder <br /> involved in the project <br /> o [Many light fixtures on top floor replaced with permanent LED can lights having <br /> drastically decreased wattage. Some newly-added lighting but still a net decrease in <br /> wattage on each feeder] <br /> • (v) Modifications to existing electrical installations where all of the following conditions are <br /> met: <br /> o (A) Service or distribution equipment involved is rated not more than 400 amperes <br /> and does not exceed 250 volts or for lighting circuits not exceeding 277 volts to <br /> ground; <br /> [True, entire house does not exceed this] <br /> o (B) Does not involve emergency systems other than listed unit equipment per NEC <br /> 700.12(F); <br /> [No emergency systems on the property] <br /> o (C) Does not involve branch circuits or feeders of an essential electrical system as <br /> defined in NEC 517.2; and <br /> [no essential systems or medical care on the property] <br /> o (D) Service or feeder load calculations are increased by 5%or less. <br /> [No changes to service or the feeder loads] <br /> (vii) For installations in (a)(ii), (iii), and (v) of this subsection to be considered,the following <br /> must be available to the electrical inspector before the work is initiated: <br /> • A clear and adequate description of the project's scope; <br /> • (B)A load calculation(s); <br /> • (C) What the load changes are, providing both before and after panel schedules as needed; <br /> and <br /> • (D) Provide information showing that the service and feeder(s) supplying the panel(s)where <br /> the work is taking place has adequate capacity for any increased load and has code <br /> compliant overcurrent protection for that supply. <br /> [No increased load this N/A] <br /> Wave Drive Electric Permit.docx; Page 1 of 2 Mark Lesyna Printed 12/5/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.