Laserfiche WebLink
� � r w <br /> 5 <br /> FINAL MITIGATED <br /> DETERMINATION OF NON-SIGIVIFICANCE <br /> SEPAN01-008 <br /> Cobalt Building Addition <br /> 5/17/O1 <br /> Description of Proposal: Addition of 2,000 sq.ft. to existing office building with added parking and a <br /> modification to the landscape requirements. <br /> Applicant: Kenneth Brewe <br /> PO Box 448 <br /> GVERETT, WA 98206 <br /> Representative: Ivxelanie Hendrickson <br /> PO Box 448 <br /> EVERETT, WA 98206 <br /> Location: 3525 Colby Ave <br /> � <br /> Zoning: B-1 and R-5 C-0 I <br /> General Plan: 4.1 and 2.5 II <br /> Lead Agency: Ciry of Everett Planning Department I <br /> Contact Person: Mike Palacios Phone: (425)257-8731 <br /> Mitigation Measures: <br /> The environmental impacts of this ptoposal are documented in the Environmental Checklist and other <br /> information on file with the Ciry. The listed requirements are placed in response to our review of this <br /> information: <br /> AGENCIES WITH NRISDICTION <br /> None <br /> MITIGATION OF ADVERSE IMPACTS BY SEPA I <br /> 1. Any grading/fill on this site sUall be done so as to not impact the surrounding properties. (SEPA <br /> Earth, Land and Shoreline Use Policies.) <br /> 2. Prior to issuance of any permits, the Applicant must pay a traffic mitigation fee of$6,300.00 per <br /> the Traffic Mitigation Ordinance No. 1670-89, as amended. (SEPA Transportation Policies) <br /> 3. Colby Avenue is designated as a "Gateway" corridor in the Ciry's General Plan. The General Plan <br /> states, "Because Everett wanu to develop and promote an attractive image, all entry corridors inro <br /> � 2930 Wehnore,Suite 8-A,Everett,WA 98201-4044 �Z (425)257-8731, Fax(425)257-8742 , <br /> �age ( o'�' 3 <br />� <br />