City of Lake Stevens 1/31/2020
>
Contracts
>
Agreement
>
Interlocal Agreements
>
City of Lake Stevens 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:09 AM
Creation date
2/4/2020 11:46:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
City of Lake Stevens
Approval Date
1/31/2020
Council Approval Date
1/29/2020
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
91st Avenue SE Roadway Extension
Tracking Number
0002204
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stevens will call for bids and execute a construction contract in accordance with the Lake Stevens' <br /> usual procurement processes and in accordance with the following: <br /> (a) The 91st Ave Project bid package and contract will include the Final <br /> Transmission Line Project Plans and Specifications for the Transmission Line Work. The <br /> Transmission Line Work will be a separate bid schedule in the 91st Ave Project bid <br /> package. The bid package will inform bidders that the bid award will be determined based <br /> upon bidders' total bid amounts for the entire 91st Ave Project, including the Transmission <br /> Line Work. <br /> (b) Everett may require inclusion of the supplemental responsibility criteria <br /> regarding contractor experience in transmission line or similar work for the Transmission <br /> Line Work. If so, Everett will provide the criteria for inclusion in the 91st Ave Project bid <br /> package. The criteria will allow a bidder to meet the criteria either through the experience <br /> of the bidder itself or by the experience of the bidder's designated transmission line <br /> subcontractor. <br /> (c) The construction contract will contain a provision requiring Everett be <br /> added as an additional insured on the contractor's required liability insurance policies. <br /> (d) The construction contract will contain a clause acceptable to Everett that <br /> assigns all contractor's and manufacturer's warranties related to the Transmission Line <br /> Work to Everett. <br /> 2. Construction Contract Award (Two Contracts). If Lake Stevens determines that <br /> the 91st Ave Project and Transmission Line Work will be awarded as two separate contracts,then <br /> Lake Stevens will call for bids and execute construction contracts in accordance with the Lake <br /> Stevens' usual procurement processes and in accordance with Sections 1.C.1(b)-(d) above. <br /> 3. No Obligation to Award. Lake Stevens may reject all bids or otherwise determine <br /> to not proceed with a construction contract for the 91st Ave Project at Lake Stevens' sole <br /> discretion. However, if Lake Stevens awards the 91st Ave Project, it must also award the <br /> Transmission Line Work in accordance with this Agreement. <br /> D. Construction. <br /> 1. Lake Stevens shall complete the 91st Ave Project and all Transmission Line Work, <br /> in accordance with the Final Transmission Line Project Plans and Specifications and in accordance <br /> with the 91st Ave Use Permit. Lake Stevens will designate Everett as lead in the coordination, <br /> oversight and inspection of Transmission Line Work. Lake Stevens will substantially complete <br /> the Transmission Line Work no later than the date of substantial completion of the 91st Ave <br /> Project. <br /> 2. Everett will be invited to attend all construction meetings that involve the <br /> Transmission Line Work. Everett will manage all connections to the transmission lines and the <br /> operational coordination, including when the work can occur, the duration of the work, the <br /> inspection of the connections, and oversight of the contractor. <br /> 4 <br />