My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2405 COLBY AVE 2020-03-09
>
Address Records
>
COLBY AVE
>
2405
>
2405 COLBY AVE 2020-03-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 7:25:20 AM
Creation date
2/6/2020 8:14:43 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2405
Notes
EVERETT HIGH VOCATIONAL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
riEurr CITY OF EVERETT <br /> Public Works Department <br /> April 25, 2019 <br /> Corey Wright <br /> Dykeman Architecture + Design <br /> 1716 West Marine View Drive <br /> Everett, WA 98201 <br /> corevw@ dykeman.net <br /> Owner: Everett School District #2 <br /> Job Address: 2405 Colby Avenue <br /> Plan Check No: B1904-005 <br /> RE: Building Permit Review Letter <br /> Dear Mr. Wright, <br /> In response to the application for a building permit, the plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. <br /> General <br /> 1. For clarification, if the historical type of construction for the building is II-FR, the current <br /> type of construction would be I-B (vs. II-A as shown on Sheet CS01). <br /> 2. An electrical plan review is required for the proposed scope of work. The submission of <br /> an electrical permit package will trigger the commencement of the review. <br /> 3. A mechanical plan review is required for the proposed scope of work. The submission of <br /> a mechanical permit package will trigger the commencement of the review. <br /> a. As a pre-comment before the review, the non-rated floor/ceiling penetration in <br /> Detail 5/M9.01 should be removed (as all floors are rated if this Type I-B <br /> construction). Section 714.4 <br /> 4. New doors into the corridor on Level 3 should be shown as minimum 20-minute smoke <br /> and draft control assemblies. Sections 1020.1 and 716.5.3 <br /> a. The toilet rooms on Level 3 should be separated from the corridor with minimum <br /> one-hour rated fire partitions and 20-minute doors. Section 1020.1 <br /> 5. The plans show various 1 and 2 hour walls around the existing exit stairs (with up to 90- <br /> minute doors). For a baseline of new construction, only one-hour walls with 60-minute <br /> doors are required. <br /> n 3200 Cedar Street 425.257.8810 © tlee@everettwa.gov <br /> �/ Everett,WA 98201 0 425.257.8857 fax everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.