My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/05/28 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/05/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:18:14 PM
Creation date
2/6/2020 10:51:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/28/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />2. Final Construction Cost Estimate — 2 paper copies; 1 electronic (Excel file) <br />Task 1000 Construction Support Services <br />The Scope of Services described in Amendment No. 1 is amended as follows. <br />Assumptions <br />• Phase 1 Construction will commence in December 2014 and be complete in January, <br />2016. <br />Activities <br />Meetings. The Consultant will attend monthly meetings (fifteen), each with a duration of 3 hours. <br />The Project Manager will attend eight (8) meetings. The Project Engineer will attend fifteen (15) <br />meetings. <br />Submittal Review. The Consultant will review submittals as selected by the City, with a total <br />level of effort limited by the budget included in Amendment No. 1, excepting as adjusted for <br />escalation herein. <br />RFI, Change Orders. The Consultant will respond to RFI and Change Orders as selected by <br />the City, with a total level of effort limited by the budget included in Amendment No. 1, excepting <br />as adjusted for escalation herein. <br />End of Scope of Services for <br />the Sewer "M" portion <br />of Amendment No. 3 <br />Version 3 11 4/29/14 <br />133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.