3 <br />work from the plans and specifications, engineering redesign services to accommodate the <br />change, etc.). <br />B. Permitting. The Port will apply for and obtain any necessary permits to allow <br />for construction of the PSO 2 Work. The City acknowledges that the Port Everett Shipyard <br />project is being conducted under a Department of Ecology Consent Decree schedule and must be <br />conducted within the 2014/2015 in -water work window. Accordingly, the City shall fast track <br />with the Port in obtaining permits necessary for the PSO 2 work. <br />C. Procurement. <br />1. Construction Contract. After approval of the PSO 2 Approved Plans and <br />Specifications and the receipt of all necessary permits for the PSO 2 Work, the Port will call for <br />bids and execute a construction contract for Everett Shipyard project (including the PSO 2 Work) <br />in accordance with the Port's usual procurement processes and the Port's standard form <br />construction contracts, except that: <br />(a) The PSO 2 Work will be a separate bid schedule in the Everett <br />Shipyard project bid package. The bid package will inform bidders that the bid award will be <br />determined based upon bidders' total bid amounts for the entire Everett Shipyard project, <br />including the PSO 2 Work schedule. However, the bid package may also state that, if it is <br />determined not to award the PSO 2 Work (see Section C.2 below), then the bid award will be <br />determined based upon bidders' total bid amounts for the entire Everett Shipyard project, but not <br />including the PSO 2 Work schedule. <br />(b) The contract will state that the PSO 2 Work may be removed from <br />the project by unilateral deductive change order, in which case (i) the contract value will <br />decrease by the amount of the PSO 2 Work Schedule and (ii) the contractor's entitlement to <br />compensation for the removal of the PSO 2 Work from the project will be strictly limited to <br />reimbursement for costs already directly incurred by the contractor for PSO 2 Work, such as <br />purchased by contractor prior to the date of the deductive change order. <br />(c) The construction contract will contain a provision requiring the <br />City be added as an additional insured on the contractor's required liability insurance policies. <br />(d) The construction contract will contain a clause acceptable to the <br />City that allows the Port to assign all contractor's and manufacturer's warranties from the Port to <br />the City. <br />2. Bidding Off -Ramps. Upon opening of the bids for construction of the <br />Everett Shipyard project, the Parties will meet and confer. <br />(a) City Off- Ramp. If the City determines, in the exercise of its sole <br />discretion, to not proceed with the PSO 2 Work, then the City may terminate Section 2 of this <br />Agreement by delivering a written termination notice to the Port no later than two (2) days after <br />the opening of such bids and the City's receipt of the bid results, in which case the Port will <br />SOM\03221\0081\00762427.V 1 <br />6 <br />11 <br />