My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/05/28 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/05/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:18:14 PM
Creation date
2/6/2020 10:51:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/28/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />Subtask 211- Extreme Event Modeling. The purpose of this task is to complete a modeling <br />analysis of "extreme event" impacts on Sewer "M" design. The following subtasks are included: <br />211.1. Project Management - same as in current agreement. <br />211.2. Meetings - One 1-hour phone meeting to discuss results. <br />211.3. Model Recent Rainfall Events. <br />a. Apply 6/9/2010, 8/29/2013, 9/5-6/2013 rainfall events to the Sewer <br />Phase 1 and Phase 2 alternatives. <br />b. Compare results to design event. <br />c. Note which event is worst. <br />d. Note if CSO is predicted for any of the events. <br />e. Assumes 6 simulations. <br />211.4. Mitigate Impacts <br />a. If additional basement flooding occurs, attempt to mitigate with additional <br />system improvements (for the worst -case scenario of the three storms). <br />b. Otherwise, summarize the additional street flooding from stormwater. <br />c. Assumes 2 simulations. <br />211.5. Test Grand Avenue Trunk for Surcharging <br />a. Test to see if the existing Grand Avenue trunk surcharges under Phase 1 <br />conditions with: <br />1. The single 36-inch, stormwater HDD installed. <br />2. The low -flow connection between the stormwater and combined systems <br />closed. <br />b. Assumes 1 simulation. <br />211.6. CSO Compliance with Once -Per -Year Requirement <br />a. Apply 69-storm series, adding the recent 8/29/2013, 9/5-6/2013 rainfall <br />events. <br />b. Run simulation of Single HDD Alternative with Sewer "M" Phases 1 & 2 <br />completed. <br />c. Identify predicted CSO events. <br />211.7. Summarize Findings - in brief memorandum, using a table or bullet -point format. <br />211.8. QAIQC <br />Deliverables: <br />1. Brief memorandum summarizing findings of model runs and conclusions, using a table or <br />bullet -point format. <br />Subtask 212 - Refinement of Alternatives for Single HDD vs. Utility Bridge <br />212.1. Project Management - same as in current agreement. <br />212.2. Meetings <br />Version 3 15 <br />4/29/14 <br />137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.