Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> May 17, 2019 <br /> Mr. Brian Bodge <br /> 3007 Everett Avenue <br /> Everett, WA 98201 <br /> Email Address: brianbodge@msn.com <br /> RE: Owner: Howard Bargreen <br /> Job Address: 3007 Everett Avenue <br /> Plan Check Number: B1901-029, Second Building Review <br /> Dear Mr. Bodge, <br /> We have reviewed the responses to the First Review letter dated March 6, 2019. Multiple <br /> comments have not been completely addressed and require additional action before a permit can <br /> be issued. These comments address building issues only. The comments are itemized for <br /> consistency with the original review letter. Additional revisions or additions may be required by <br /> other departments including Public Works, Planning, and Fire. <br /> Code citations provided in the following comments reference the 2015 International Building Code <br /> (IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br /> Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br /> Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br /> Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br /> is the 2009"Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). Federal ADA, FHA, <br /> and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br /> more restrictive. References to other design standards include the current edition. <br /> In order for the processing of your application to continue, the following documentation should be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. One copy of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Pagel of 4 <br />