Laserfiche WebLink
BB102-Transformation 3 scope doc <br /> Flip Easy+ Merchandise <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. Project Team responsible for merchandising. <br /> Fixture Installers— Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. <br /> Flip with SOH <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. Relocate Samsung SOH display (2 Stores 859 & 871). <br /> Fixture Installers— Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. <br /> • New SOH Flooring required for new location (GC to secure materials). <br /> Flip with Car Optimization <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. Project Team responsible for merchandising. <br /> Fixture Installers— Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. <br /> Networked Audio Adjacency Correction <br /> • Condense the Networked Audio displays into one location within the Home Theater department. <br /> Project Team Only. <br /> Mobile 2020 Lite <br /> • Modify existing Mobile Department including new POS station add, Mobile Menu Board, and assist <br /> with other minimal fixture reflow. <br /> Fixture Installers — Build and install new storage cabinet. Install Mobile Menu Board fixture <br /> and extensions per the AST drawings in the landing zone. <br /> Electrical Disconnect/Reconnect new POS as needed. Reroute Apple Flatwire if indicated. <br /> Flooring — Patch flooring over any rerouted Apple flatwire runs. <br /> DI Reflow and Optimization <br /> • Reflow Digital Imaging space to improve layout and a more intuitive shopping environment <br /> to customers and employees. <br /> Fixture Installers — Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> • Run additional Quads to ends, and center of lowbays with Cameras or Camcorders. <br /> ' Flooring — Patch flooring where needed. <br /> • If Hurricane Fixture Moves, there will patch under Totems and casework. <br />