My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 SE EVERETT MALL WAY BEST BUY 2020-02-06
>
Address Records
>
SE EVERETT MALL WAY
>
1130
>
BEST BUY
>
1130 SE EVERETT MALL WAY BEST BUY 2020-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:23:56 PM
Creation date
2/6/2020 3:23:32 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1130
Tenant Name
BEST BUY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BB102-Transformation 3 scope doc <br /> Flip Easy+ Merchandise <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. Project Team responsible for merchandising. <br /> Fixture Installers— Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. <br /> Flip with SOH <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. Relocate Samsung SOH display (2 Stores 859 & 871). <br /> Fixture Installers— Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. <br /> • New SOH Flooring required for new location (GC to secure materials). <br /> Flip with Car Optimization <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. Project Team responsible for merchandising. <br /> Fixture Installers— Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. <br /> Networked Audio Adjacency Correction <br /> • Condense the Networked Audio displays into one location within the Home Theater department. <br /> Project Team Only. <br /> Mobile 2020 Lite <br /> • Modify existing Mobile Department including new POS station add, Mobile Menu Board, and assist <br /> with other minimal fixture reflow. <br /> Fixture Installers — Build and install new storage cabinet. Install Mobile Menu Board fixture <br /> and extensions per the AST drawings in the landing zone. <br /> Electrical Disconnect/Reconnect new POS as needed. Reroute Apple Flatwire if indicated. <br /> Flooring — Patch flooring over any rerouted Apple flatwire runs. <br /> DI Reflow and Optimization <br /> • Reflow Digital Imaging space to improve layout and a more intuitive shopping environment <br /> to customers and employees. <br /> Fixture Installers — Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> • Run additional Quads to ends, and center of lowbays with Cameras or Camcorders. <br /> ' Flooring — Patch flooring where needed. <br /> • If Hurricane Fixture Moves, there will patch under Totems and casework. <br />
The URL can be used to link to this page
Your browser does not support the video tag.