My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 SE EVERETT MALL WAY BEST BUY 2020-02-06
>
Address Records
>
SE EVERETT MALL WAY
>
1130
>
BEST BUY
>
1130 SE EVERETT MALL WAY BEST BUY 2020-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:23:56 PM
Creation date
2/6/2020 3:23:32 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1130
Tenant Name
BEST BUY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nom - Ol--( � <br /> BB1O2-Transformation 3-scope doc C� <br /> ***Take direction from the GC lead on site**** <br /> General Scope of Work <br /> • Scope and Projects will vary for all Stores, but most will have electrical disconnects and reconnects. <br /> Fixture Installer — Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect/Reconnect power and/or add power if none is present. <br /> Flooring — Project specific. <br /> HT Non Vendor Pad Refresh <br /> • Remove outdated/unsupported TV Experiences 1-4 (Tech Spoke) fixtures and replace with <br /> DS3/4 endcaps. <br /> Fixture Installers — Demo and dispose of outdated/unsupported fixture displays in Home Theater. <br /> Electrical — Disconnect power from outdated/unsupported fixture displays in Home Theater. <br /> Flooring — No scope. <br /> HT Brand Vignettes&Brand Walls <br /> • Re-label Brand Vignettes to Brand Walls. <br /> Project Team Only. <br /> Electrical — May require disconnect/reconnect power for a small set of Stores. <br /> Projectors Adjacency <br /> • Improve the customer experience by condensing the Projectors into one pl o rat.�• ' -• <br /> within the Home Theater department. JUN 0 7 20 <br /> ' Project Team Only. 19 <br /> cITy <br /> OF <br /> •Nintendo Smiles to Aisles Permit en cesET2' <br /> • Reflow of the gaming department, adding Nintendo end cap display table and inline displays. <br /> Fixture Installers—Assemble and anchor table. Assist with fixture move and build as needed. <br /> Electrical — Disconnect/rec nfeet power ensure EMS . s ;power is available, Add if needed <br /> ' Flooring — No flooring scope. <br /> Appliances Optimization <br /> • Reflow of department to better optimize the space and assortment. <br /> ' Fixture Installers — Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect,and reconnect power to all relocated LBGs, products, and fixtures. <br /> ' Flooring —Varies from Patch to full department flooring scope. <br /> Flip Easy <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. <br /> Fixture Installers — Build and reflow of fixtures to accommodate space and product. <br /> ' Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. -, <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.