Laserfiche WebLink
nom - Ol--( � <br /> BB1O2-Transformation 3-scope doc C� <br /> ***Take direction from the GC lead on site**** <br /> General Scope of Work <br /> • Scope and Projects will vary for all Stores, but most will have electrical disconnects and reconnects. <br /> Fixture Installer — Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect/Reconnect power and/or add power if none is present. <br /> Flooring — Project specific. <br /> HT Non Vendor Pad Refresh <br /> • Remove outdated/unsupported TV Experiences 1-4 (Tech Spoke) fixtures and replace with <br /> DS3/4 endcaps. <br /> Fixture Installers — Demo and dispose of outdated/unsupported fixture displays in Home Theater. <br /> Electrical — Disconnect power from outdated/unsupported fixture displays in Home Theater. <br /> Flooring — No scope. <br /> HT Brand Vignettes&Brand Walls <br /> • Re-label Brand Vignettes to Brand Walls. <br /> Project Team Only. <br /> Electrical — May require disconnect/reconnect power for a small set of Stores. <br /> Projectors Adjacency <br /> • Improve the customer experience by condensing the Projectors into one pl o rat.�• ' -• <br /> within the Home Theater department. JUN 0 7 20 <br /> ' Project Team Only. 19 <br /> cITy <br /> OF <br /> •Nintendo Smiles to Aisles Permit en cesET2' <br /> • Reflow of the gaming department, adding Nintendo end cap display table and inline displays. <br /> Fixture Installers—Assemble and anchor table. Assist with fixture move and build as needed. <br /> Electrical — Disconnect/rec nfeet power ensure EMS . s ;power is available, Add if needed <br /> ' Flooring — No flooring scope. <br /> Appliances Optimization <br /> • Reflow of department to better optimize the space and assortment. <br /> ' Fixture Installers — Build and reflow of fixtures to accommodate space and product. <br /> Electrical — Disconnect,and reconnect power to all relocated LBGs, products, and fixtures. <br /> ' Flooring —Varies from Patch to full department flooring scope. <br /> Flip Easy <br /> • Relocate Appliances department to more prominent location in the store. Optimization Scope will be <br /> incorporated into reflow. <br /> Fixture Installers — Build and reflow of fixtures to accommodate space and product. <br /> ' Electrical — Disconnect and reconnect power to all relocated LBGs, products, and fixtures. <br /> Flooring —Varies from Patch to full department flooring scope. -, <br /> I <br />