Laserfiche WebLink
Sheet: <br /> Job No.: <br /> Caic. By.: EA Date: <br /> Chck'd By.: Date; <br /> ANCHORAGE LOADS <br /> EQUIPMENT GEOMETRY <br /> HEIGHT OF CENTER OF MASS, Cm (IN.)= 20.50 (IN.) <br /> DISTANCE BETWEEN ANCHORS, a(IN.)= 59.00 (IN.) <br /> DISTANCE BETWEEN ANCHORS, b(IN.)= 88.00 (IN.) <br /> TOTAL LATERAL FORCE(ASD METHOD) <br /> HORIZONTAL FORCE, Fp(KIPS)= 0.74 (KIPS) <br /> NOTE:THE SHORTEST PLAN <br /> DIMENSION OF THE EQUIPMENT <br /> CORRESPONDS TO"a" <br /> ° -0 FPV <br /> p <br /> a12 F Y A/If <br /> Wp <br /> Fp <br /> X <br /> cm <br /> b/2 b/2 I <br /> 141 <br /> PLAN ELEVATION <br /> eMAX=TAN-1 (b/a)= 56.2 (DEGRESS) <br /> TmAx= <br /> [(-0.9 X WP FPVY4] {[(Fp X Cm)!2]X RCOSOwa Ib) (sinemAxI a)])= 155 (LBS) <br /> PmAx=[(We+Fpv)/4]+{RFp X Cm)/2]X RCOSOmAx/b)+(SinOmAx/a)]) 155 (LBS) <br /> VMAX=Fp 1(4 anchors)= 186 (LBS) <br />