My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6220 EVERGREEN WAY VALUE VILLAGE 2020-02-07
>
Address Records
>
EVERGREEN WAY
>
6220
>
VALUE VILLAGE
>
6220 EVERGREEN WAY VALUE VILLAGE 2020-02-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 10:05:39 AM
Creation date
2/7/2020 10:04:30 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6220
Tenant Name
VALUE VILLAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br /> From: Drew Martin <br /> Sent: Wednesday,January 9, 2019 4:06 PM <br /> To: 'Steve.lehtinen@comfortsystemsusa.com' <br /> Subject: City of Everett Permit Services: 6220 Evergreen Way(M1810-038) <br /> Steve, <br /> I'm following up on our phone conversation. Please review the information and let me know if you have questions. <br /> The following should be addressed for the calculations: <br /> 1. The calculations appear to primarily address the existing GLBs at the 7.5' spacing. However,the units are <br /> centered over the larger GLB (identified in the calculations as the"drop beam"). This glulam beam and the <br /> supporting column(s)are of more interest to verify sizes and capacities. These members may be adequate, but <br /> without any information, it is not clear they are sufficient. <br /> 2. Continuing with the previous comment,the support for the GLB at the exterior wall is also not clear. The type of <br /> support (e.g., bearing on a framed wall,connection to a concrete tilt-up wall, etc.)should be clarified. The <br /> construction and capacity of this support condition should be verified. <br /> The following should be:addressed for the drawings: <br /> 3. A drawing with the structural notes and detail(s)for the support of the mechanical units should be submitted for <br /> inclusion in the drawing set. <br /> 4. Detail SSK-2 is partially unreadable (i.e., left side). A clear copy should be used. <br /> 5. A partial plan clarifying the proposed construction of the mechanical unit support framing is recommended. <br /> 6. The following revisions to Detail SSK-2 are recommended: <br /> a. The 4x8 blocking appears to be connected to the sleepers using Simpson HU hangers. The make <br /> and specific model of the hangers should be stated. <br /> b. The detail specify connecting the channel curb to the sleepers with sheet metal screws. Wood <br /> screws should be used. <br /> As we discussed, I can review an electronic copy of the new sheet prior to you sending it. Two hardcopies of the new <br /> sheet should be submitted to collate into the sets previously sent. <br /> CELEBRATING Drew Martin, P.E.,S.E. <br /> 0412 Associate Engineer—Commercial Plans Examiner 1 Permit Services <br /> YEARS 425.257.8813 1 3200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/permits Facebook 1 Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.