My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6220 EVERGREEN WAY VALUE VILLAGE 2020-02-07
>
Address Records
>
EVERGREEN WAY
>
6220
>
VALUE VILLAGE
>
6220 EVERGREEN WAY VALUE VILLAGE 2020-02-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 10:05:39 AM
Creation date
2/7/2020 10:04:30 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6220
Tenant Name
VALUE VILLAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMFORT <br /> SYSTEMS <br /> Northwest <br /> Date: May 24, 2019 n _ <br /> ! r7:7:4 <br /> , 7t 7 <br /> To: City of Everett <br /> Public Works Department <br /> 3200 Cedar Street JUN 0 5 2Q19 <br /> Everett,WA 98201 CITY OF EVERETT <br /> Permit Services <br /> COE Reviewer: Drew Martin, P.E.,S.E. (dmartin@everettwa.gov) <br /> Associate Engineer/Commercial Plans Examiner <br /> Regarding: Plan Check Number M1810-038,Third Review <br /> Project Name: Value Village, Replace Two (2) Packaged Rooftop HVAC Units <br /> Project Address: Value Village#1021 <br /> 6220 Evergreen Way <br /> Everett,WA 98203 <br /> Regarding our mechanical permit application for the above referenced project number M1810-038,the <br /> following review comments, dated January 15,2019 were received by our office(via e-mail).The <br /> comments are repeated below followed with our response.The corresponding design modifications are <br /> shown in revision clouds on each drawing. <br /> The updated rooftop unit structural anchorage/support design details and calculations are included with <br /> this plan set. <br /> Review Comments(via E-mail 1-15-2019) Response(by EA and SAL) <br /> The following should be addressed for the calculations: <br /> 1. The calculations appear to primarily address the 1. Calculation page 4 addresses this comment. <br /> existing GLBs at the 7.5'spacing. However,the <br /> units are centered over the larger GLB(identified in <br /> the calculations as the"drop beam").This glulam <br /> beam and the supporting column(s)are of more <br /> interest to verify sizes and capacities.These <br /> members may be adequate,but without any <br /> information,it is not clear they are sufficient. <br /> 2. Continuing with the previous comment,the 2. Calculation pages 4,7.1 and 7.2 address this <br /> support for the GLB at the exterior wall is also not comment. <br /> clear.The type of support(e.g.,bearing on a <br /> framed wall,connection to a concrete tilt-up wall, <br /> etc.)should be clarified.The construction and <br /> capacity of this support condition should be <br /> verified. <br /> Page 1 of 2 <br /> 18702 North Creek Pkwy,Ste 110 I Bothell,Washington 98011 1(425)883-9224 I www.comfortsystemsusanorthwest.com Quality People Building SolutionsTM <br />
The URL can be used to link to this page
Your browser does not support the video tag.