Laserfiche WebLink
November 4, 2018 <br /> Drew Martin, PE,SE <br /> City of Everett Public Works Department <br /> 3200 Cedar St. <br /> Everett,WA 98201 <br /> Subject: Value Village#1021-(city of Everett Plan Check#M1810-038) <br /> First Review <br /> Dear Drew; <br /> Below is an itemized list of response to plan check comments dated October 12, 2018. <br /> Corrections: <br /> General: <br /> 1. Please see enclosed supplemental calculations of existing framing. <br /> 2. Please see enclosed supplenmental calculations,4x sleepers to be add that span from GLB <br /> to GLB. <br /> 3. Please see revised SSK-2 detail. <br /> If you have any further questions, please don't hesitate to contact us. <br /> Sincerely, <br /> ACD ENGINEERING <br /> ideze44 <br /> Eduardo Avelar, P.E.S.E. <br /> ACD Engineering 10510 190th St E Puyallup,WA 98374 206-251-1340 Page 1/0 <br />